Park West CC(16)-CS 910517DATE:
TO:
FROM:
RE:
COPPELL PUBLIC WORKI
M~ORANDUN
May 17, 1991
Shohre Daneshmand, Acting City Engineez
Pafford, er
be
The following fees shoul assesse~6~--on~he above referenced
project.
Water Impact Fee:
1 - 2" Domestic Meter/s = 8 ESU's
1 - 2" Irrigation Meter/s = 8 ESU's
3 - 8" Fireline Meter/s = 7.5 ESU's
Total 23.5 ESU's ~ $660.00 ea = $15,510.00
100% due prior to Council approval of final plat.
Wastewater Impact Fee:
1 - 2" Domestic Meter/s = 8 ESU's ~ $422.00 = $3,376.00
100% due prior to Council approval of final plat.
* Note: If property to be developed is in the Coppell Municipal
Utility District #1 this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City and MUD.
Water Tap Inspection Fee
5 . Connections @ $100.00 each = $ 500.00
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee N/A
__ Connections @ $100.00 each =
100% due prior to issuance of building permit.
Street Lighting Fee
N/A
Shall be assessed and paid prior to final acceptance of project.
Note:
This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee N/A
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
N/A Residential Lots at $150.00 each = S
N/A Units (Multi family) at $75.00 each = $
N/A
N/A
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
Cc: Steven G. Goram, Director of Public Works
STREET SIGN ASSESSMENT
for Thacker Container
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN
UNIT PRICE QUANTITY
EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85
OTHER
TOTAL
* Cost breakdowns may be obtained from Public Works bywritten
request.
Revised 4/1/91