Loading...
St Ann Catholic-CS000406 (2) 214 J04 J570 04/06/00 16:05 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.078 P.O, Bm 47~ ENGINEERING DEPARTMENT FAX COVER SHEET ID Urgent l'1 For Re, view 0 Pleaa~ Comment 0 please aep~ 0 As Request, ed IF YOU DO NOT RECEIVE ALL OF ~ PAGES, PI.EASE CALL (972) 304=3679 04×06×00 16:05 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.078 Q02 DEVELOPMENT FEES PROJECT NAME: ENGINEER: REVISION DATE: SENT ASSESSMENT Park Fee 4/4/00 4/4/00 9/15/99 Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Roadway Impact.Zone 3 Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS Saint Ann Cat'holic Church Addition Pacheco Koch Consulting Engineers 4/6/2000 ASSESSED FEE AMOUNT PAID DATE $3,600.00 $3,600.00 $3,600,00 4/6/00 $3,600.00 4/6/00 $15,52852 $6,528.60 noti~ street dept. $i5,528.52 4~6~00 $6,528,60 4/6100 $150.00 $50.00 $192.05 $6,434,40 $35.00 $60.00 $50.00 Total Fees $36.228.57 NOTES $150,00 4/6/00 $50,00 4/6/00 $192.05 4/6/00 $6,434.40 4/6/00 $35.00 4/6/00 $60.00 4/6/00 $50.00 4/6/00 Fees Paid Amount Owed $36,228.57 $0.00 '1 Prior To Construction Erosion Control Approved E.P.A.,N.O,I. Recd, Const. Plan Approved Irrigetlon Plan Rccd. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan ApproveO Erosion Control Maint. 04×06×00 16:06 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.078 3T. ANNCATHOLIC PARISH FOR: CITY OF COPPELL DATE: 04/06/00 INVOICE # INV DATE IMPACT FEES 04/06/00 28226 CHw'CK: 28226 AMOLSN'T MEMO/P.O. PAID 36,228.57 36,228.57 TOTAL: $ 36,228.57 ST. ANN CATHOLIC PARISH mOS-rNA~O~AL t80 SAMUEL BLVd. COPPELL. 1')( 75019 COPPELL, ~ PH 972-393-5.5~4 30-9-1140 **THIRTY SZX THOUSAND, PAY TO THE ORDER OF CITY OF COPPELL PO BOX 478 255 PARKWAY BLVD COPPELL, TX 75019 TWO HUNDRED AND TWENTY EIGHT AND 57/100 DOLLARS** AMOUNT 04/06/00 **$36,228.5? m; & i~-~'''-'- ...... &hO000: 0~×06/00 16~06 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.078 /~'-~ The City With A Be.utiful ~e~xtff/~~ ~  CO PPE~.L. i'~XA5 71~11 ~1 ~ Box 4~8 ~e[I. Texas 75019 972-462-~2 April 4, 2000 Ciuis Ioues, P.E. Pacheco Koch Consulting Engineers 9401 LBS Freeway, Suite 300 Dallas, Texas 75243 RE: St. Ann Catholic ~hurch Addition - R~vbed Fees Fee Assessment letter Dear Mr. ]ones: ee~~~. n shee~ f°r the ~ Enclosed is a copy ofhh~ Cji7 of Copp¢ll Roadway Impaci F r~ferenced developmcnt. / _... · ~ Please make paymcm to thc City of Coppell ia Be reno ~}~nt. of~ ~a~d. for~_ard to ~he due th, Ci ' prior to ¢ ,.' . rer.o .... fcc a.sscsam6nt tables fur a breakdown of the~e fees. ~,dso, pica.se pr~vice a copy of the conat~uctiou coutracf to the F. ngineering Departmcni to verify thc applicable inspection fees. Providing a copy of your paid receipt to the Engineering Depa..lme~t will help u.s to verify the payment of mquir~ fees and insure a succet, sfal beginnlrlg of this project. We look forward to working with you on this p~oject. If you have any questions, please contact me. Sincerely, Kent M. Collins, P.E. Civil Engineer CC: J'emiifer Armstrong, Finance Director Doug Stevens, ~e~tingTec. bnloian Glcnn Hollowcli, Assislnm Director of Publlc Works C, reg Ionas, Chief Building Official Gary Sims, Director of Leisu~ Services 04/06/00 16:06 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.078 04/05/U~ 14:50 CITY OF CO~I~LL ENGINEERING ~ 214 ~(~2 628~ N0.065 ~0~ DEVELOPMENT FEE TABLE Project: ~t. Ann CathOlW Char~k Addition - R~gzed Fees '"T6TAj= AMOUNT DUE FEES DUE PRIOR'TO COUNCIL Water Impact Fee $3~500.00 " $3,600.00 ' (100% due prior m Council Approval) Water Tap In~peetioa Fe~ '" $150.00 (100~ due at Issuange of Warm' Meter) Water Metro, Fee ('Dom~ (1oo~ due a~ ~.s,,~n~e of Wa~ ~ctor) Water ~eter Icc (In'iptiow'Fh'elb~) S6,434.~J~ (100% due at Is~, aace, or Water Meter) Water Meier Deposit ('Domgsti~) $35.00 (100% due at Iss .uance of War~ Meter) Irrigatioa/Fireli~e lviet~r DeposR $60.00 (100% due at Lssuaace of Wate~ Meter} Wastcwater Impact Fee $3,600.00 $3,600.00 ,,, 000% due prior to Couacil_ Approval) Wastewater Tap Inipecti°n F~ $50.00 (100% due at ls~an¢,e o,f,,Building Permit) Utility Final In~i~Ction Fee SS0.00 (100% duc at Issuanc~ of ltuilding Permi0 Pa~k Fee S0.00 $0.00 (100% d,.u.e prior to Council Approval) Roadway Impact Fee '"' $6,528.60 $6j28.60 (100% due prior Io Council Approval) Su~;t Light Fcc ' (1oO% due prior to Acc. eptance of Project Su'eet Sign Fee .__ {10~,,% due prior to Acceptance of Project Construction Im~ao~ Fe~ ~ aol Availabl~ TOTAL $20,700.0~ TO?A ", O aVr rUE ?0 COU CU, PgOV 04×06×00 16:07 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.078 ~d 14:b~ ~l~ U~ CL.~I~'ELL EN~IIx~ERIN~ = 214 982 6~80 N0.065 DEVELOPMENT FEE WORKSHEET PROJECT: ~ A~n CetAa~c Chutes ~n . ~r. cf F~ez DATE: 04/04/2000 w~er Impact Fee: Dome;dc Meter(s): I~getion Meter(s): Fireline Meter(s): 1 - 2 inch = 6 0 = 0 0 = 0 2 - 8inr.~ = 0 Total #: $ ESU's ~ ~,50.00 ea. (1T~ ~ue prior te Gou~il approve; of the final plat) Water Tap Inspection Fee: Total #; 3 Cor~t~iens ~ $50.00 ge, (Single family due prior m I~,uance of buMing pamtlt) (All other developments clue p~r to issu&'!ee of me~') Domestic Water Meter Fee: Total #: 1 Domestic Me,er(s) ~ $192.05 (Single family due prier ~ issuers of I~uikling ~tmlt) (All other develol3menls due prier ~o ~suance of meter) IrHgafloWlalreliae Water Meter Fee: Total #: 0 II1'lgeUon Meter(s) ~ Tota~ #: 0 Adclitienel Irriga~on Meter(s) {1 To,al #: ~ Fimline Me~e~s) ~ $3,217.20 (lo13% (]ua prior to Issuance of water meter~) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) ~ $3~.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: .__2L Meter(s) ~ 130.00 ea. (~00% due prior to issuance of wata~ rrmtet~} Wastewater Impact Fee: Total Oome~Uc Meters ESU'$: 8 ~ ~tSO.O0 ea. Wa~tcwater Tap Inspection Fee: Total ~ 1 Conne~tiens ~ $50.00 ea. (100% due prior ~O isSUa~lCq of bulklit~ pefl~t) UtiliW Final Inspection Fee (All developmenf]): Total #: t Lots ~ $50.00 ea. (100% ~ue prior m I~u~ce ~ ~dJ~ p~) ESU~ ESU~ ESU' N~e:Fim Mst~Assss~e Wi~ O~ginalBulld~g $3.600~0 $3.00 S~O.O0 $3,600.00 $50.00 Page I 04×06×00 16:09 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.078 ~07 DEVELOPMENT FEE WORKSHEET · Park Fee (For Residential Developments Only): ' Prelhnlnary plat approved: 0 0 Roadway Impact Fee: (See attached fee calculation) Street Lighting Fees: Assessed for lighting in me City's ~ight-~f-wav. This fee cann~t be asse~ed unti after T.U. Electrl~ submits the lighting plan for the l~mgmsed devefopment. Once the I~tans are submitted. $2~.60 ~ light will be assessed. (100% due prior to teal aee, e,~an= of develot~menl) Street Siga Fees: Assessed for signage in the City's ~ight-0f-way. (See attac~ed fee calculations if applicable) Construction Inspection Fees: A COpy of I~e development cenlra~ must be subm~ for ~me~t. · at am ins~cted ~ ~e Engining ~ent. (2% of develo~t ~l r~uJ~ ~ p~ ~pr~m~) (4% of develop~nt Page 2 112fom~t~Availal~l.e ~ 04×06/00 1G:07 CITY OF COPPELL ENGINEERING ~ CITY DF COPPELL N0,078 ROADWAY IMPACT FEE CALCULATIONS DATE, RCJArJWA ¥ FMPA (~T 41.85 V-:~:~:~ _ua.~ per ~.~-.~ Uui~ ** 0.$2 ~ ' · (Pigum 2 - Romlway Imp,,,'t Fee Study) '" (Table 3 - l~advay Imper~ Fee Study) ~cla:did~ 2, Page 3 - 04/06×00 16:09 CITY OF COPPELL ENGINEERING '~ CITY OF COPPELL ).R.J. PA g'I'NG, INC ,'-x P.O. ~OX $9954 D~,T~ 75229 (972) #57-2291 NO. 0?8 l~lttc~ment of.. ~E2~R & SP,~CING Prices quoted incl~ do not inci~ the following ~ ~erlng ~ ~Joint~ - ~ ~rJoint $ealer ~ bo~ ~ ~c control CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.078 AREA Excnvetion & Utlll~ Contmctorn P.O. Box 423 Mansfmld. Texas 76063 METRO: (817)417-9700 FAX: (817) December 17, 1999 Centex Construction Co 10150 Nonroe Dr. Dallas, ?eXes 75229 Attn: Jeff Parsons: gr. Ann Cathulic Church Coppeli. Texas Utility Work Gentlemen, Area Excavation & Utility Contractors propose to furnish the necessary labor, materials and equipment to install the following quantities of work. Plans by Pacheco Kech Consulting Engineers. Plans d~ted NOv. 1999. Alternate bid ref pages C2,02A and pages C2.02 and C3.01. C3,01A. Base bid Storm Drainage Znstall 24- storm dFainage 270LF Ineta21 217 Storm drainage 30LF Remove exist inlets 4 each Install 14' curb inlet I each Install 10' curb inlets 2 each Install 12. curb inlets I each Water Nain Install 8- rater line Install 6" water line Install 2- water line .I~stall necessary cast 8" gs~e valves 8X8 tad sleeve & valves 6" gate valves Total Amount: II77LF 361LF 300LF iron ~ittings I each 3 each ~ each $24,540.00 Lump Sum 3 each Install new de~ector check & vault I each Relocate existing detector check & vault Relocate 2., I each Pave,,nt rep:;;vices(meters) 2 each 250LB T°taz Amount: $60,395.00 ~ ~-~ CENTEX 32 34 35 37 42