ST9502-CS 961029The City With A Beautiful Future
October 29, 1996
James A. Koch, Jr., P.E.
Pacheco Koch Engineers, Inc.
9401 LB~ Freeway, Suite 300
Dallas, Texas 75243
P.O. Box 478
Coppell, Texas 75019
214-462-0022
RE: Town Center Blvd.
Final Acceptance
Dear Mr. Koch:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from thc contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
Sincer,e//~,
Construction Inspector
cc.*
Kenneth M. Griffin, P.E., ACM/City Engineer
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Travis Crump, Acting Fire Marshal
Doug Stevens, Engineering Technician
Mike Boney, Site Concrete
file/Idavis/0finalae.ltr