Loading...
ST9502-CS 961029The City With A Beautiful Future October 29, 1996 James A. Koch, Jr., P.E. Pacheco Koch Engineers, Inc. 9401 LB~ Freeway, Suite 300 Dallas, Texas 75243 P.O. Box 478 Coppell, Texas 75019 214-462-0022 RE: Town Center Blvd. Final Acceptance Dear Mr. Koch: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from thc contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Sincer,e//~, Construction Inspector cc.* Kenneth M. Griffin, P.E., ACM/City Engineer Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Travis Crump, Acting Fire Marshal Doug Stevens, Engineering Technician Mike Boney, Site Concrete file/Idavis/0finalae.ltr