Loading...
ST9502-CS 960717 (2)ENGINEERING - STREET DIVISION MEMORANDUM DATE: July 17, 1996 TO: Larry Davis, Construction Inspactor FROM~ Per Birdsall, Sign signal Tech.~U~p-^'~ RE: Walk Thru for Town Center Blvd. A walk through was conducted at the above referenced location today. The following deficiencies were identified: Parkway Left Turn Lane 1. On the westbound reverse curve curb return - repair. 2. Median paver bands on existing pavement curbs need to be sealed so to retain sand under pavers. Towncenter Blvd. 1. ? 4" PVC in ADA ramp on northeast corner Towncenter Blvd./Parkway 2. Markings? Southbound Towncenter Blvd. 1. Manhole finish rout and seal crack. 2. Remove two birdbaths southbound lane north of Towncenter Drive. 3. Curb broken on median southbound lane north on Towncenter Drive. 4. Remove form rd. side Towncenter Blvd./Towncenter Drive southbound lanes. 5. Repair existing curb rd. side southbound lanes Towncenter Blvd./Towncenter Drive. Northbound Towncenter Blvd. 1. Northbound lane remove stain from pavement just south of Parkway. Ge er_~omments 1. Street needs to be cleaned to determine birdbaths· Towncenter Drive/Towncenter Blvd. Project med. nose southbound lanes random crack. From center line Towncenter Blvd. on Towncenter Drive north, curb on the east side needs repaired. Not poured integral -- broken by construction traffic for Criminal Justice Center. PB/bc