Loading...
Town Center L3B3-CS01090701×25/2002 12:09 CITY OF -OPPELL ENGR. DEPT. ~ SRU CTR N0.419 Q02 DEVELOPMENT FEES IIPROJECT NAME: SENT ASSESSMENT WelchT°Wn Center, Lot 3, Block 3 (First American Bank) 09/07/2001 ASSESSED FEE AMOUNT PAID DATE Park Fee 09/07/2001 09/07/2001 Water Impact Fee (revised 10/29/0[) Wastewater Impact Fee (revised 10/29/01) Street Sign $2,800,00 $1,400.00 01/16/2002 Street Light Early Grading 2% Construct[on Inspection $944.64 $3,879.20 noti~ streetdept. $944.64 $3,879.20 12/20/2001 01/16/2002 Roadway Impact. Zone N/A Street Cut Permit Overtimelnspection 09/07/2001 09/07/2001 09/07/2001 09/07/2001 09/07/2001 09/07/2001 09/07/2001 Water Tap Inspection $150,00 Wastewater Tap Inspection $50.00 Water Meter (Domestic) $142.10 Water Meter (Fire/~rrig) $2,154.69 Meter Deposit (Domestic) $30.00 Meter Deposit (Fire/Irrlg) $60,00 Utility Final Inspection $5000 Total Fees TOTALS Si 1,660.63 Notify utility dept. when meters, taps r deposits are paid Fees Paid $4,823,84 Amount Owed $6,836.79 NOTES Prior To Construction Erosion Control Approved E.P.A..N.O.I, Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recci Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. CITY 0F n0PPELL ENGR. <DEPT. a SRU CTR N0.419 October 26, 2001 Bruce Dunne, P.E. Welch Engineering, Inc. 4109 Cagle Drive, Suite D North Kichlmd Hills, Texas 76180 '~ ~' ~ow~ ~t~r, Lol 3 Block 3 (Fir~ American Bank) tevis~ Dear Mr. Dunnc: Enclosed is a copy of the City of Coppell Development Fee Assessment Table, along with a copy of the Development Fee calculations for the referenced development. There are no fees due on this project at Otis time. However, please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. Plcose note that the Texas Legislanire, under Senate Bill 243, delayed the collection of Water and Scwcr Impact Fees until thc issuance ora Building Permit. Senatc Bill 243 also reduced the impact fcc we could assess for water and sewer to no morc than 50% of the calculatcd fcc in the original study. The additional fees for water and sewer taps, water meters, and utility inspection fees need ~o be paid by separate check at the Public Works Sarvic¢ Center, 732 Deforest Road. Meters will be arc paid. Appropriate payment of the required fees will help insure a successfiil beginning of thls project. We look forward to working with you on this project. If you have any questions, plea.se feel flee to contact me at your convenience. Sim:erely,m Kenneth M. Gdffm, Director of l:-ngincering~ublic Work~ cc: Jennifer Armstrong, Finance Directo.r~.~., .......... - . . ~'~i~-Hollow~ll[, ~is~ D~or of Public ~g Jone~ C~ef B~lding Offici~ ~ S~ D~tor of Lei~ Se~ces 01423/2002 12:09 CITY OF %OPPELL ENGR. DEPT, a SRU CTR N0.419 Q04 D 'VELOPMENT FEE TABLE i ~.,~ ~?~ :~l,ow~et~ter, ~m 3 Block $ (Fir~ American J~tnlt) revl~ed TOTAL AMOUN~ DUE FEES DUE PRIOR TO COUNCIL ' APPROVAL Water ~pact Fee $2.800.00 ~!.00% due at Issuance of Braiding Permit) Water Tap I~pection Fee $150.00 ~100% due at Issuance of Water Meter) Water Me~er Fee (Domestic) $142.10 (100% due at Issumce of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,154.69 (100% due at Issuance.. of Water Meter) ~Vatet Meter Deposit (Domestic) $30.00 (100% due at I. ssuance of Water Mel~t) l~gat~ow1:~Ai~e.r Deposit (! 00% due at Issuance of Water M. eter) Waz:ewa~er L~npa~t Fee $1,400.00 (100% due at Issuance of Building Perr~t) 1~'a.~tewaler Tap Inspection Fee $50.00 (100% due a~ Issuance of Buildin~ Per,.it) Utility Final Inspection Fee $$0.06 (I 00% due at Issuance of Building Permit) ' Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 '(100% due prior to Council Approval) S~et Light Fee Information not Available (100% due prior to Acceptance of Project~) Stree[ Sign Fee Information not Av~lable (100% due pnor to Acceptance of Pro~ec0 Conslxuction Inspection Fee InfOrmation not Available (I 00% du.e ~rior to Sta.~ of Construction) TOT.aL ~' .... $6,836.79 TOTAL AMOt T nvz Pmoa TO COUNCIL APPROVAL $0.00 01/23/2002 12:09 CITY OF ¢OPPELL ENGR. DEPT. e SRU CTR N0.419 DE~'~LOPMENT FEE ~ WORKSHEET PROJECT: Town Center, £ot $ Block $ (First American Bank) r~vised DATE: 10/26/2001 Water Impact Fee: Domestic Metro(s): Fi~lfle Idetads): 1 - I 1/2 inch = 5 ESU's 1, t,io¢ ......... = .... 2.5 EaU's = 0 EaU's' I - 8 inch ..... = 2.5 ESU's Total #: 10 ESU's @ $280.00 ea. (Due prior to issuance of budding permit) Water Tap Inspection Fee: Total ~ 3 Conne~ons ~ $50~00 ea. (Single family due prior to Issuance of buiRJing permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: To[al #: 1 Domestic Meter(s) @ $142.10 ~amily clue prior to issuance of building permit) (AIl other developments due 0nor to issuance of meter) lrri~[ation/Fireline Water Meter Fee: Total #: 1 I mgation Meter(s) ~ Total #: 0 Additional Irrigation Meter(s) ~ Total #: 1 Firellne Meter(s) (~ Domestic Water Me~r Deposit Fee: Tomt ~; ~ Meters) ~ $30.O0 ea. (100% due pdor to issuance of water meters) $62.25 S0.00 ~092.44 Irrigation/Fire Meter Deposit Fee: Total · 2 Meter(s) ~ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 (Due pdor to issuance of building permit) ~ ~80.00 ea. Wastewater Tap luspeefion Fee: ToMi #: I Connections @ $50,00 ea- ~ue prior to issuance of building germit} Utilily Final lnspectiou Fee (All developments): Total #: 1 Lots ~ $50,00 ea. ~ue prior to issuance of buiidit~g permit) $150.00 $142.10 ~82.25 $000 $2,092.44 ~0.00 $60.00 $1,400.00 $50.00 $50.00 Page I 01z~3×~00~ 12:09 CITY OF -OPPELL ENGR. DEPT. a SRU CTR DEVELOPMENT FEE WORKSHE~" Park F~ (For Residen~al Developments Only): * Preliminary plat approved: Single-family ~ $0.00 per lot Mulli-family ~ S0.00 per unit paid prior to Council approvaJ of final plat) paid at issuance qf buil(Jing permit) Roadway Impact Fee: (See attained fee calculations) Slreet ]~,btJng Fees: the ligh~g plan for the proposed development. Once the plans am submitted, $292,60 per light will be assessecl, (100% due prior to final acceptance of development) $0.00 $0.00 $0.00 InformalJon not Available Str~get Sip Fee~: AsseT~ed for sigflaga in the Cily's right-of-way. {See attached fee calculations if applicable) Informs§on not Available Coosrruction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts shoul0 indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development <;est required for prNate improvements) (4% of development coat required for public improvements) Information not Available Page 2 12:09 CITY OF COPPELL ENGR, DEPT, ROADWAY IMPACT FEE CALCULA'I~ONS DAT~: ROADWAY IMPACT FEE: Service Area * ~ [.and U~ '* B~ ~velopment Oni~ ** 5.00 V=hicl~ MiI~s ~T D~velopmcm U~t ** 2.11 ~e~ ~r Veh/ch Mile *** $300 ~o~wsy ~p~ F~e due = ~elopmont Uniu) x ~ohiolo Mi~ ~ ~volo~cnt UnTO x ~ ~r Vehicle Milo) = S].161.~ * 0~i~ure 2 · Roadway Impaol Fee Study) ** (Tablo 3 - Roadway [mpa~t F~ Study) *** (Schodulo 2, Pago 3 - Roadway imp~:! Fee Study) A6 per the 1982 Univest Agreement. this property cannot be assessed for Denton Tap Road & ~andy LaKe Roed. ~emfore, ~o RM~ay Impel gee ~11 ~ ~[le~ed on th~ pmj~. Pcrccnt ofCr~it To~ ~y ]mp~t Fees 100% To~ C~dit ~, 161.84