Loading...
Town Center L3B3-CS010907 (2)DEVELOPMENT FEES I iPROJECT NAME: ENGINEER: ~)RIGINATION DATE: Town Center, Lot 3, Block 3 (First American Bank) Welch 9/7/01 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee 9/7/01 9/7/01 Water Impact Fee (revised 10/29/01 ) Wastewater Impact Fee (revised 10/29/01 ) Street Sign $2,800.00 $1,400.00 Street Light 1/16/02 Construction Inspection $3,879.20 $3,879.20 · rb 1/16/02 Roadway Impact-Zone N/A Early Grading 2% $944.64 $944.64 rb 12/20/01 4/17/02 Erosion control failure $464.00 3/18/02 3/25/02 4/1/02 9/7/01 9/7/01 9/7/01 9/7/01 9/7/01 9/7/01 9/7/01 Overtime Inspection Overtime Inspection Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection $250.00 $120.00 $80.00 $80.00 rb 4/16/02 $150.00 $50.00 $142.10 $2,154.69 $2,092.44 2/27/02 $30.00 $60.00 $30.00 2/27/02 $50.00 $50.00 2~7/02 Subtotal due to Eng. $5,737.84 $4,903.84 $834.00 TOTALS TotalFees Fees Paid Amount Owed $12,574.63 $7,076.28 $5,498.35 Prier To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan__Approved Date # of ~ Post-it* Fax Note 7671 ~'~/5/~l~l~es / / NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.