ST9502-CS 960327COPI~LL F~GI~G
UT~rI~ DIVISION
DATE:
TO:
FROM:
RE:
March 27, 1996
Larry Davis, Construction Inspector
Ted Dutt, Interim Utilities Superintendenf~)-
Walk thru for Spine Road and Fast/West Blvd.
A walk-thru on the above referenced project was conducted on 3/26/96 and all items have
been taken care of at this time.
If you have any questions, please give me a call.
TD/dg