Loading...
Town Center L3B3-CS010906DEVELOPMENT FEE TABLE Project: Town Center Addition, Lot 3, Block 3 (First American Bank) Date: 9/6/2001 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,500.00 $4,500.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $137.81 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,220.12 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irdgation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Buildin~ Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Buildin~ Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project II Street Sign Fee Information not Available <100% due prior to acceptance of Project II Construction Inspection Fee Information not Available II tOTAL $9,452.93 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $6,750.00 C DEVELOPMENT FEE WORKSHEET PROJECT: Town Center Addition, Lot 3, Block 3 (First American Bank) ~'~ATE: 9/6/2001 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): I - 1 1/2 inch = 5 ESU's 1 - 1 inch = 2.5 ESU's 0 = 0 ESU's 1 - 8 inch = 2.5 ESU's Total #: 10 ESU's ~ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total 0: 3 Connections @ $50.00 ea. (Single family due pdor to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $137.81 (Single family due pdor to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $62.74 ~ Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: I Fireline Meter(s) ~ $2,157.38 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 $450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ail developments): Total #: I Lots ~ $50.00 ea. (100% due prior to issuance of building permit) $4,500.00 $150.00 $137.81 $62.74 $0.00 $2,157.38 $35.00 $60.00 $2,250.00 $50.00 $50.00 Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: 2 Single-family ~ $0.00 per lot Multi-family @ $0.00 per unit (50% paid pdor to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.0o $0.00 $0.00 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Town Center Addition, Lot $, Block $ (First American Bank) 9/g/2001 ROADWAY IMPACT FEE: Service Area * 2 ~ate~or~ ** Commercial ,.and Use ** Bank 3uildln~ Area (So 4,995 Development Units ** 5.00 Vehicle Miles per Development Unit ** 2.11 Fee Per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit/ x (Fee per Vehicle Mile~ = $3,161.84 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) As per the 1982 Univest agreement this property can not be assessed for Denton Tap Rd. & Sandy Lake Rd. Therefore no Roadway Impact Fee will be collected on this project. I AMOUNTDUE: $0.00 [