Town Center L3B3-CS010906DEVELOPMENT FEE TABLE
Project: Town Center Addition, Lot 3, Block 3 (First American Bank)
Date: 9/6/2001
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $4,500.00 $4,500.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $137.81
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $2,220.12
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Irdgation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Buildin~ Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Buildin~ Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project II
Street Sign Fee Information not Available
<100% due prior to acceptance of Project II
Construction Inspection Fee Information not Available
II
tOTAL $9,452.93
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $6,750.00
C
DEVELOPMENT FEE WORKSHEET
PROJECT: Town Center Addition, Lot 3, Block 3 (First American Bank)
~'~ATE: 9/6/2001
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
I - 1 1/2 inch = 5 ESU's
1 - 1 inch = 2.5 ESU's
0 = 0 ESU's
1 - 8 inch = 2.5 ESU's
Total #: 10 ESU's ~ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total 0: 3 Connections @ $50.00 ea.
(Single family due pdor to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $137.81
(Single family due pdor to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $62.74
~ Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: I Fireline Meter(s) ~ $2,157.38
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
5
$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (Ail developments):
Total #: I Lots ~ $50.00 ea.
(100% due prior to issuance of building permit)
$4,500.00
$150.00
$137.81
$62.74
$0.00
$2,157.38
$35.00
$60.00
$2,250.00
$50.00
$50.00
Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved:
2
Single-family ~ $0.00 per lot
Multi-family @ $0.00 per unit
(50% paid pdor to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
$0.0o
$0.00
$0.00
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Town Center Addition, Lot $, Block $ (First American Bank)
9/g/2001
ROADWAY IMPACT FEE:
Service Area * 2
~ate~or~ ** Commercial
,.and Use ** Bank
3uildln~ Area (So 4,995
Development Units ** 5.00
Vehicle Miles per Development Unit ** 2.11
Fee Per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit/ x (Fee per Vehicle Mile~ = $3,161.84
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
As per the 1982 Univest agreement this property can not be assessed for Denton Tap Rd.
& Sandy Lake Rd. Therefore no Roadway Impact Fee will be collected on this project.
I AMOUNTDUE: $0.00 [