Loading...
Town Center L3B3-CS010907 (3) T H £ · C I T Y · 0 F COPPE L September 7, 2001 Bruce Dunne Welch Engineering, Inc. 4109 Cagle Drive, Suite D North Richland Hills, TX 76180 RE: Town Center Addition, Lot 3, Block 3 (First American Bank) Fee Assessment Letter C Dear Mr. Dunne: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the mount of $6,750.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. 'INs amount is a portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 732 Deforest. Meters will be ordered when these fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, ~ Kenneth M. (Sriffin, P.E. Director of Engineering/Public Works CC: Jennifer Armstrong, Finance Director Rhonda Brothers, Secretary Ol~,n Holloweli, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services