Loading...
Town Center L3B3-CS010907 (4)DEVELOPMENT FEES PROJECT NAME: ENGINEER: OR G NAT ON DATE: SENT ASSESSMENT Park Fee 09/07/2001 09/07/2001 Water Impact Fee (revised 10/29/01) Wastewater Impact Fee (revised 10/29/01) Street Sign Street Light 01/16/2002 Construction Inspection Roadway Impact-Zone Early Grading 04/17/2002 Erosion control failure 03/18/2002 03/25/2002 04/01/2002 09/07/2001 09/07/2001 09/07/2001 09/07/2001 Overtime Inspection Overtime Inspection Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) 09/07/2001 09/07/2001 Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) 09/07/2001 Utility Final Inspection Subtotal due to Eng. TOTALS Town Center, Lot 3, Block 3 (First American Bank) Welch 09/07/2001 ASSESSED FEE AMOUNT PAID DATE $2,800.00 $1,400.00 $2,800.00 rb 06/04/2002 $1,400.00 rb 06/04/2002 $3,879.20 $3,879.20 rb N/A $944.64 $944.64 rb $464.00 $464.00 rb $250.00 $250.00 rb $120.00 $120.00 rb $80.00 $80.00 rb $150.00 $150.00 rb $50.00 $50.00 rb $142.10 $142.10 rb $2,154.69 $2,092.44 $62.25 rb $30.00 $30.00 rb $60.00 $30.00 $30.00 rb $50.00 $50.00 $5,737.84 $5,737.84 TotaIFees Fees Paid $12,574.63 $12,574.63 01/16/2002 12/20/2001 06/04/2OO2 05/13/2002 05/13/2002 04/16/2002 06/04/2002 06/04/2002 06/04/2002 02/27/2002 06/04/2002 06/04/2002 02/27/2O02 06/04/2002 02/27/2002 $0.00 Amount Owed $0.00 Prior To Construction Erosion Control Approved E.P.A.*N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. ~5/15/~ ~9:~S CITf OF C~ELL · 99~39~ H0.072 DEVELOPMENT FROJECT NAME: ENGINEER: ORIGINATION DATE: ASSEgaMENT Park Fee 9/7/01 Water Imi~tct Fee (revised 10129/01 ) wast~Natlr Impact Fee 9/7/01 (revis~l 10129/01) Street Sign Street Light 1 I1 ~02 Construction Inspectk~ Roadway k~pact-Zone Eadv Ored;~g 2% 4/I 7/02 E¢osio~ control failure 3116/02 3125/02 411/02 9/7t01 9/7/01 9/7/01 9/7/01 917t01 9/7101 Over, me I~pection Overtime InspeQtlon O~ertime Ins,oe~tion Water Tap Inaplc~mfl Waatewa~r Tip Inspeclion Water Meter (Domestic) Water Meter (Fire/Irrio) Meter D~osit (Domesficl Meter DN~osit (Fite/trdg) UTility Final Inspection aul~otal due to Eng, TOTAL~ Town Center. Lot 3, Block 3 (First American Bankl W~¢h A$SE$~EO I~E AMOUNT PAID DATE $2,8O0.00 t 1.400.00 $3,87g,20 N/A $944.64 $464.00 $250.00 t120.00 $80,00 $160.00 $50.00 ~142.10 $2,; $¢.6g t30.00 $50.0O $3,879.20 rb 1/16/02 $944.64 rb 12120/01 $80.00 rb 4116/02 12,09: ~ 2t27~)2 ~ ~ 2/27~02 050.00 -- 2127/02 $5,737.g4 $4,903.~4 S834.00 Total Fm S12,574.63 Fees Paid Ammm'-'t Owed $7,076.28 06,496.36 NOTES Prior TO Coflst~uctien E~osio~ Control Approved E.P.A.-N.O.I. Recd. Const. Ptan Approved __.. Date Rece~ed Plier To F'mal Acceptance As guilt I~ Recd. Paving Bona Utilities Bond Recd. Erosion Conuol Mains,