Town Center West-CS010125 ~14 31~z~ 3570
13:15 C OF ~PELL ENGINEERING '~ CITY 0 'OPP[ NO. 965
Ja~uar~ 25, 2001
Mr. All~n Hinckle¥
12201 Merit Drive, Suit~ 170
Dallas, TX 75251
RE: Town Center West, Block A, Lot I
Final Walk-thru
COPPELL
Allen:
Pl~ise be ~vised that a walk-through has been scheduled for Friday, January 26, 2001 at 8:00 a.m.
for the water, s~itary sewer, paving and drainage facilities in the r~fer~ne~ proje~-t
Ple~s~ cnsur~ that all facilities arc clean and ~cessiblc at that time and that contractor's
r~presentatives are present to assist with thc hasp~tion.
Your ~OOl~ration hi this effort is greatly appreciated. If you should have any questions, please call
972-304-3685 at your earliest convenience.
Sinc~ly,
Construction Inspector
Mark S. Nelon - FAX 214/871-9749
HCI Contractors, Inc.
703 McKinney, Suite 308 LB 112
Dallas, TX 75202
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official