Town Center L1B1-CS 950705DATE:
TO:
FROH :
RE:
COPPELL ENGINEERING
MEMORANDUM
July 5, 1~95
Mike Martin, E.I.T.
H~Wevaerl~p~C~orFCLsUtfiOlrit~ew~ S~[irn~~e~ ~10verton Bank
The following fees
referenced project.
Water Impact Fee:
~ - ~ 1/2"
should be assessed and collected on the above
Domestic Meter/s = 2.5 ESU's
Irrigation Meter/s = 5 ESU's
Total 7,$ ESU's ~ $450.00 ea = $ 3.375.00
100% due prior to Council approval of the final plat.
wastewaterXmpact
Total 2.5
Domestic Meter/s ~ 2.5 ESU's
ESU's ~ $450.00 ea = $ 1,~25.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
~ Connections ~ $100.00 each = S 2o0.00
100% due prior to issuance of building permit for residential. (Or in
the case of.multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
J UtilitF Final Inspection Fee (Ail Development)
~ lots ~ ~ = $ 50.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Water Meter Fee (Domestic)
~ 1 - ~" Domestic Meters @ $ 46.10es = $ 46.10
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - 1 1/2" Irrigation Meter/s @ S 129.05ea = $ 129.05
100% due prior to issuance of water meter/s.
Water NeterDeposit (Wulti-Fa~ily or Non-Residential)
~ Meters @ $$5.00 ea = $ $~.00
100% due prior to issuance of water meters.
Irrigation HeterDeposit
~ Neters @ $35.00 ea = $ $5.00
100% due prior to issuance of water meters.
Towncenter