Loading...
Town Center L1B1-CS 950705DATE: TO: FROH : RE: COPPELL ENGINEERING MEMORANDUM July 5, 1~95 Mike Martin, E.I.T. H~Wevaerl~p~C~orFCLsUtfiOlrit~ew~ S~[irn~~e~ ~10verton Bank The following fees referenced project. Water Impact Fee: ~ - ~ 1/2" should be assessed and collected on the above Domestic Meter/s = 2.5 ESU's Irrigation Meter/s = 5 ESU's Total 7,$ ESU's ~ $450.00 ea = $ 3.375.00 100% due prior to Council approval of the final plat. wastewaterXmpact Total 2.5 Domestic Meter/s ~ 2.5 ESU's ESU's ~ $450.00 ea = $ 1,~25.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee ~ Connections ~ $100.00 each = S 2o0.00 100% due prior to issuance of building permit for residential. (Or in the case of.multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). J UtilitF Final Inspection Fee (Ail Development) ~ lots ~ ~ = $ 50.00 100% due prior to issuance of building permit. Development Fees Page 2 Water Meter Fee (Domestic) ~ 1 - ~" Domestic Meters @ $ 46.10es = $ 46.10 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 1 1/2" Irrigation Meter/s @ S 129.05ea = $ 129.05 100% due prior to issuance of water meter/s. Water NeterDeposit (Wulti-Fa~ily or Non-Residential) ~ Meters @ $$5.00 ea = $ $~.00 100% due prior to issuance of water meters. Irrigation HeterDeposit ~ Neters @ $35.00 ea = $ $5.00 100% due prior to issuance of water meters. Towncenter