Loading...
Town Center BP-CS001023October 23, 2000 Kelly Jordan K. Jordan Investments, Inc. 2639 Walnut Hill Lane, Suite 200 Dallas, TX 75206 RE: Town Center Business Park Fee Assessment Letter C Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in thc amount of$11.925.00 and forward to thc Finance Dep~uh,ent along with a copy of thc Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of thc Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, . Michael A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Debbie Ingrain, Secretary Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE WORKSHEET ,{OJECT: DATE: Town Center Business Park 10/23/00 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 2 inch = 8 ESU's 1 - 2 inch = 8 ESU's 0 = 0 ESU's 1 -8inch = 2.5 ESU's{~, Total #: 18.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $189.37 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) :igation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $189.37 Total #: 0 Additional irrigation Meter(s) @ $0.00 Total #: 1 Fireline Meter(s) @ $2,157.38 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 0: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) ~-Itility Final Inspection vee (All developments): ' Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 $8,325.00 $150.00 $189.37 $189.37 $0.00 $2,157.38 $35.00 $80.00 $3,600.00 $50.00 $50.00 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminat7 plat approved: Single-family ~} $0.50 per lot Multi-family ~1 $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting In the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $0.00 Information not Available /.~reet Si;n Fees: (,.. Assessed for signage in the City's right-of-way. (See attached foe calculations if applicable) Information not Available Constrnction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available C P~e2 PROJECT: DATE: ROADWAY ][MI~ACT-FEE CALCULATIONS Town Cen:er Business Park 10/23/00 C ROADWAY IMPACT ~ervice Area * 2 "atel~ory ** Office Land Use ** General Office Bld~. Building Area (si) 19,850 Development Units ** 19.85 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile *** ' $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $23,760.45 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) As per the 1982 Univest agreement this property can not be assessed for Denton Tap Rd. & Sandy Lake Rd. Therefore no Roadway Impact Fee will be collected on this project. Percent of Credit Toward Roadway Impact Fees 100% Total Credit $23,760.45 DEVELOPMENT FEE TABLE Project: Town Center Business Park Date: TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $189.37 (100% due at Issuance of Water Meter) Water Meter Fee (In'igation~ireline) $2,346.75 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee [nformatiun not Available (100% due prior to Acceptance of Project Street Sign Fee Information not Available (100% due prior to Acceptance of Project Construction Inspection Fee Information not Available TOTAL $14,806.12 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $11,925.00 C