Town Center L1B2-CS000125 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To~
From:
Date:
RE:
Garreth Campbell, Construction Inspector Engineering
Ernest Powell, Utilities Division Public Works
January 25, 2000
Follow-up Walk-thru Tom Thumb
I. All O.K.
CI~'Y OF COPPELL PUBLIC WORKS DEPARTMENT
MESSAGE CONFIRMATION
01×25/00 14:35
ID=CITY OF COPPELL
DATE
01/25
S,R-TIME DISTANT STATION ID MODE PAGES
00'21" CITY OF COPPELL CALLING 01
RESULT
OK 0000
WATER
Check for: Accuracy test: Meter Leak:
Initial meter relocation iaspections
Grid map:
Re-read
1. Backflow Inso. 2. Repair 3. ' t._M&iaL~.!.gi~ 4. Other
Backflow lnsp. A. Main Line A. Pump
Bkflow Cert. Date B. Valves B. Water Tower
Re-Cert. Date C. Service Line C. Samples
D. Hydrants D. Equipment
E. Safety
A. Line Locate
B. Line Locate
C. Tap
D Excavation
5. Reason for failure: A, Electrolysis B. New Construction C Poor Installation D. Other
6. List of safety equipment at site if appllcable:
A. Barricades B. Cones C. Tape D. Lights E. Other.
7. If Meter/Service Leak: Classify: - City:
A. Water Loss (estimate): GPM __
B. Was Water Metered: Yes
C. Was Customer Notified: Verbally
Customer
Fire plug flushing Total Gallons
No
Doorknocker -
Vehicle/Equipment Used
8. If Meter Change Out:
A. Old Meter #
B. NewMeter #
C. OldMeter Size/Type:
Unit # Miles Hfs Equipment
Reading
Reading
D New Meter Size/Type
E. Type of work performed or findings:
9. If mainline or deep service repair, describe type of pipe or service line and condition:
t0. Ma~i-hours:
Crew Members.
11. List Materials Used: ' r ' '
12. If you had an accidentAncident while performing this request. Did you report it? Yes or no
13. Water Utilities meter inspection: pass or fail
14. How many ~ps to do task?
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To~
Date:
RE:
Garreth Campbell, Construction Inspector Engineering
Danny Hightower, Utilities Division Public Works
January 21, 2000
Walk-thru Tom ~numb 1/21/00
2.
3.
4.
5.
6.
Manhole chimney seals need to be raised.
Two inch double checks-ball valves need caps.
Vault needs caps and plugs on the ball valves.
Reset the blocking under wheel valves in vault.
Need a hin~e on top of vault.
Irrigation meter needs a 2" curb stop.
CITY OF COPPELL PUBLIC IVORK$ DEPARTMENT
214 504 55?0
01/20/00 16:55 CITY DF CDPPELL ENGINEERING ~ CITY OF COPPELL N0.791
he City With A Beautiful Future
O 80X
OPPE[J,.. TEXAS 75019
January20,2000
RO. Box 478
Copoelk Texas 75019
972-462,002.2
Mr. Doug Talley, Sr. Project Manager
Hill & Wilkinson, Inc.
11969 Piano Rd., Suite 190
Dallas, Texas 75243-5486
Town Center Addition, Lot 1, Block 2 (Tom Thumb)
Final Walk-thru
Dear
Doug:/' 0 [4
Please be advised that a walk-thro~ bas been scheduled .for Friday, January 21, 2000 at 9:00
a.m. for the water, sanitary sewef',~__..~:-.; --_i' 3~'~_~' :ihfies in the referenced project.
Please ensure that ali facilities are clean and accessible al thai time and that contractor's
representatives are present to assist with the im'pection.
Your cooperation in ~his effort is greatly appreciated. If you should have any questions, please
call 972-304-3685 at your earliest convenience.
Sincerely,
Lcc Stone, Commercial Inspector
Calhar Construction (fax: 972-235-6377)
Mark Morris, North American Prop. -Southwest
(fax: 972-866-9888)