Loading...
Valley R Plaza 2-CS 970904 (2)DATEs TO: FROM: RE: COPPBLL ~TREET~ DIVIHION MEMORANDUM Ssp~eBtbsr 4, ~997 Garreth Campbell, Construction Inspector Per Birdsall, Streets Division Walk-Thru Valley Ranch, 817 MacArthur Listed below are Street Division comments relative to walk thru. 1. MacArthur approaches: RC South edqe of S. Drive; Route & sea] BF ramp to drive: clean off sidewalk and place erosion control 2. Seal all ~oints (& curb cuts); repair chid @ south end of Cin let curb return; saw cut need off of cold ioint @ north end of CI curb return also rout & seal random crack; repair broken 3. curb north end of RT turn lane: erect or remove barricades; buttons for RT turn lane; DiDe needs urouted to box; invert in box? Beltline approach: seal MH block out: seal concrete approach to asphalt; continue saw joint to edge of drive; ditch standm with water. o 6o * Most items marked with oranqe/vellow paint. * silicone Seal? * Pavers off of Beltline done very poorly. DATE 09/0~ MESSAGE CONF I RMAT I ON 09×0z~×97 11: 20 ID--CITY OF COPPELL S~R-TIME DISTANT STATION ID MODE PAGES RESULT 00'22" CITY OF COPPELL CALLING 01 OK 0000