Valley R Plaza 2-CS 970904 (2)DATEs
TO:
FROM:
RE:
COPPBLL ~TREET~ DIVIHION
MEMORANDUM
Ssp~eBtbsr 4, ~997
Garreth Campbell, Construction Inspector
Per Birdsall, Streets Division
Walk-Thru Valley Ranch, 817 MacArthur
Listed below are Street Division comments relative to walk thru.
1. MacArthur approaches: RC South edqe of S. Drive; Route & sea]
BF ramp to drive: clean off sidewalk and place erosion control
2. Seal all ~oints (& curb cuts); repair chid @ south end of Cin
let curb return; saw cut need off of cold ioint @ north end of
CI curb return also rout & seal random crack; repair broken
3. curb north end of RT turn lane: erect or remove barricades;
buttons for RT turn lane; DiDe needs urouted to box; invert in
box?
Beltline approach: seal MH block out: seal concrete approach
to asphalt; continue saw joint to edge of drive; ditch standm
with water.
o
6o
* Most items marked with oranqe/vellow paint.
* silicone Seal?
* Pavers off of Beltline done very poorly.
DATE
09/0~
MESSAGE
CONF I RMAT I ON
09×0z~×97 11: 20
ID--CITY OF COPPELL
S~R-TIME DISTANT STATION ID MODE PAGES RESULT
00'22" CITY OF COPPELL CALLING 01 OK
0000