Vaughn Addition-CS051004COPPELL
October 4, 2005
Ms. Sharon Vaughn
Vaughn Construction
2221 Manana, #100
Dallas, TX 75220
RE: Vaughn Addition, Lot 1, Block A
Fee Assessment Letter
Dear Ms. Vaughn:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along wi~h a cop3, of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell in the amount of $461.70 and forward to
the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of
the assessed fees that need to be paid prior to filing of the final plat.
This fee is based on the additional impact to city facilities based on the change from a single-family
residence to an office use. The amount owed is equal to the calculated impact for an office building of this
size less the calculated amount for one single family home. Since there is no plan to change any of the
utilities, there are no utility impact fees due. If an additional irrigation meter is installed with this project,
that will constitute an impact to the system, and appropriate fees would need to be paid.
If you have any questions, or if you need additional information, please contact me.
Sincerely,
Charlene La Matt~na, E.I.T.
Graduate Engineer
cc:
Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
Project:
Date:
DEVELOPMENT FEE TABLE
Vaughn Addition, Lot l, Block A
10/4/2005
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $0.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
I Irrigation/Fireline Meter Deposit $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Filing Plat)
Roadway Impact Fee $461.70 $461.70
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) [[
Construction Inspection Fee Information not Available
(I 00% due prior to Start of Construction) Il
I~OTAL $461.70
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $461.70
DEVELOPMENT FEE WORKSHEET
PROJECT: Vaughn Addition, Lot 1, Block
DATE: 10/4/2005
Water Impact Fee:
Domestic Meter(s): 0 = 0
Irrigation Meter(s): 0 = 0
0 = 0
Fireline Meter(s): 0 = 0
Total #: 0 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total it: 0 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total it: 0 Irrigation Meter(s) @ $0.00
Total it: 0 Additional Irrigation Meter(s) @ $0.00
Total it: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total it: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total it: 0 Connections @ $50.00 ea.
~'100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total it: 0 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
@ $280.00 ea.
ESU's
ESU's
ESU's
ESU's
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
SQ00
$0.00
$0.00
$0.00
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved: After October 26, 1993
0 Single-family @ $0.00 per lot
0 Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
$0.00
$0.00
$461.7O
Information not Available
Roadway lmpact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed,
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of tile development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Depadment.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Vaughn Addition, Lot 1, Block A
10/4/2005
ROADWAY IMPACT FEE:
Category ** 5
Land Use ** Office
Building Area (sf) General Office Bldg.
Deve..~.~p_ment Units * * 1,100
~er Development Unit ** 1.10
3.99
Fee.~__~e~Vehicle Mile ***
evelo ment Unit x Fee er Vehicle Mile -- $1,316.70
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Credit for Single Family Home Impact Fee $855
$855.00