Town Center L2B1-CS 950705COPPELL ENGINEERING
MEMORANDUM
DATE: July 5, 1995
TO: Mike Martin, E.I.T.
FROM:
RE:
Howard Pafford, Utilities Superlntenaen
Development Fees for Town Center Blk. 1 Lot 2 Wendy's Denton
Tap Road
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
1 - 1 1/2"
Domestic Meter/s = 5 ESU's
1 - 1 1/2" Irrigation Meter/s = 5 ESU's
Total 10 ESU's @ $450.00 ea = $ 4,$00.00
100% due prior to Council approval of the final plat.
Wastewater Impact
- ~ 1/2" Domestic Meter/s = $ ESU's
Total $ ESU's @ $450.00 ea = ~
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
$ Connections @ $100.00 each = $ 200.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
utility Final Inspection Fee (Ail Development)
1 lots @ $50.00/lot = $ 50.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Water Meter Fee (Domestic)
1 - 1 1/2" Domestic Meters @ $ 129.05ea = $ 129.05ea
1002 due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - ~ 1/2" Irrigation Meter/s ~ $ 129.05ea
100% due prior to issuance of water meter/s.
= $ 129.05
Water Meter Deposit (Multi-F~m{~y or Non-Residential)
1 Meters ~ $35.00 ea = $ 35.00
100% due prior to issuance of water meters.
Irrigation WeterDeposit
~ Neters ~ $35.00 ea ~ $ 35.00
100% due prior to issuance of water meters.
Towncenter