Loading...
Town Center L2B1-CS 950705COPPELL ENGINEERING MEMORANDUM DATE: July 5, 1995 TO: Mike Martin, E.I.T. FROM: RE: Howard Pafford, Utilities Superlntenaen Development Fees for Town Center Blk. 1 Lot 2 Wendy's Denton Tap Road The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 1 1/2" Domestic Meter/s = 5 ESU's 1 - 1 1/2" Irrigation Meter/s = 5 ESU's Total 10 ESU's @ $450.00 ea = $ 4,$00.00 100% due prior to Council approval of the final plat. Wastewater Impact - ~ 1/2" Domestic Meter/s = $ ESU's Total $ ESU's @ $450.00 ea = ~ 100% due prior to Council approval of the final plat. Water Tap Inspection Fee $ Connections @ $100.00 each = $ 200.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/lot = $ 50.00 100% due prior to issuance of building permit. Development Fees Page 2 Water Meter Fee (Domestic) 1 - 1 1/2" Domestic Meters @ $ 129.05ea = $ 129.05ea 1002 due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - ~ 1/2" Irrigation Meter/s ~ $ 129.05ea 100% due prior to issuance of water meter/s. = $ 129.05 Water Meter Deposit (Multi-F~m{~y or Non-Residential) 1 Meters ~ $35.00 ea = $ 35.00 100% due prior to issuance of water meters. Irrigation WeterDeposit ~ Neters ~ $35.00 ea ~ $ 35.00 100% due prior to issuance of water meters. Towncenter