Loading...
Town Center L3B1-CS 960502COPP~,LL ENGIN~.RRING UTILITII~.S DIVISION M~IMORANDUM DATE: TO: FROM: RE: May 2, 1996 Larry Davis, Construction Inspector Ted Dutt, Interim Utilities SuperintendentS' Final walk thru for Comerica P~nk (Denton TaD Road) A final walk-thru on the above referenced project was conducted on 5/2/96 by Curtis lordan and all items have been corrected. Please give me a call if you have any questions. ENGZNEERZNG - STP. BET DXVZBZON DATE: TO: FRO](: RE: J(~]' 3,; 3,996 L&rry D&vis; Construct'ion Znspeotor Per Bird'tall, S~qn S'lqn&l Techn:Lc:J. an~'"'~(~) Walk Thru for Comerica Bank A walk through was conducted at the above referenced location today. The following deficiencies were identified: 0~ 1. Paver band south side insufficiently retained until future development. 0~ 2. Repair curb south side south approach and seal. 0~ 3. Route and seal random crack north of south approach. 0~ 4. Route and seal inlet to curb and random crack extending into ln. both sides. ~it 5. Grind/bush along curb to drain. 6. Pull strip and seal TC Dr. at island.