Loading...
Town Center L3B1-CS 951214 (2)·.. 7i37781823 DEC 1~ '95 13:~6 ~SKEY CONST CORP ~TRUCTION GENEK~L CONTI~O~ 987 P01 P.O. BOX 247 BELI. AIR£. T~EXA5 774OI (713J 778.0119 December 14, 1995 The City oZ Coppe~l Engineering Department C~ppell, Texas A:~tn: Mr. Atul P~tel R~: Comerlca Bank~ 128 N. Denton Tap Rd, Coppeil, Texas 75019 -Construction Development Permit ~ Application Dear Sirs: G!askey Construction Corporation is providing e description a~d cost break doWn £or work outside the property b~undarles for the above referenced project. The following i[tems shall applyl 2. Construct south fire of£ Denton TaR Rd. lane and approach $38,920.00 Provide and install concrete pavers at south fire lane approach. $4,795i00 3, Construct sidewalks outside west property line i parallel to Denton Tap Rd. $1,524~00 Construct Deceleration lane along Denton Tap Rd. This work includes demolition, concrete paving, and concrete curbS. $7,946.00 5. Relocate and ~onstruct site utilities at Denton Tap:Rd. This includes RCP piping, curb Inlet, and wa~er service : tap, $17,600~00 The total cost o~ithe above mentioned Items is in the Please fee! free {o call should you require additional information or t£we can be of ~urther assistance in order ~0 expedite the p~rmltting process. Sincerely, O~y W. Gaskey president Date: Project: July 11, 1995 Town Center BIk. 3[ Lot 3 Comerica Bank TOTAL AMOUNT DUE FEES DUE pRIOR TO COUNCIL APPROVAI~. Impact Fee (100% due prior to Council Approval) tp Inspection Fee (1005'3 due at Issuance of Water Meter) ewater Impact Fee ' (100% due prior to Council Approval) Sewer Tap Inspection Fee (100% due at Issuance of Building permit) Utiliiy Final Inspection Fee (100% due at Issuance of Building permit) Water Meter Fee .(Domestic) (100% due at Issuance of Water Meter) Water Meter Deposit (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) (100% due at Issuance of Water Meters) Irrigation Meter Deposit (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * (10i3 % due prior to Acc&ptance of Project) ark Fee (100% due prior to Council Approval) Street Excrow (100% due prior to Council Approval) Construction Inspection Fee (2% of Pro]ect Cost due prior to Preconstr. Mtg.) $4,500.00 $4,500.00 $200.00 $2,250.00 $2,250.00 ~y, $50.00 X0, $129.05 t~O' $35.00 q~O' $129.05 ~0' $35.00 0 need submittal of contracts $7.328.10 $6,750.00 AMOUNT DUE PRIOR TO coUNCIL APPROVAL This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed, lq q % ''~ ' GUY WILLIAM GASKEY 4604 SPRUCE ST 660-9660 BELLAIRE, TX 77401 4074 ["~ Compass Bank