Loading...
Town Center L3B1-CS 950711Dear Mr. Anderson: P.O. Box 478 Coppell, Texas 75019 214-462-0022 PUBLIC WORKS Enclosed is a copy of the City of Coppell Development Fee Assessment list along with a copy of the Development Fee Calculations for the Town Center Blk. 1 Lot 3 Comerica Bank. Please make payment to the City of Coppell in the amount of $6,750.00 and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/City Engineer CC: Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Park Development Coordinator Enclosures KG/ar Date: ~ July 11, 1995 CITY OF COPPELL DEVELOPMENT FEES Project: Town Center Blk. 1 Lot 3 Comerica Bank TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,500.00 $4,500.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Water Meter Fee.(Domestic) $129.05 (100% due at Issuance of Water Meter) Water Meter Deposit $35.00 (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) $129.05 (100% due at Issuance of Water Meters) Irrigation Meter Deposit $35.00 (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acc6ptance of Project) available Park Fee (100% due prior to Cou?eil Approval) Street Excrow 0 0 (t00% due prior to Council Approval) Construction Inspection Fee need submittal of 0 (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $7.328.10 $6,750.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * Thisfeecann~tbeassessedunti~afterTUE~ectricsubmitsthe~ightingp~anf~rthepr~p~sedpr~ject. Onee the plan is submitted, $292.60 per light will be assessed. ESCROW / ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Lot 3, Block 1 Town Center Addition (Comerica) 7/11/95 STREET ESCROW: Street Name(s) Denton Tap Road P4D/6 Street Type Cost per Foot $0.00 Length of Adjacem Fronta[[e (Linear Fee0 213 Escrow due = (Cost per Foot) x (Len~a of Adjacent Frontage) = $0.00 ROADWAY IMPACT FEE: Service Area * 2 Commercial Category ** Land Use ** Building Size (Sq. Ft.) Development Units ** Vehicle Miles per Developmem Unit ** Fee per Vehicle Mile Bank 0 2.11 $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee Per Vehicle Mile) = * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee. CITY OF COPPELL DEVELOPMENT FEES Date: Project: July 11, 1995 Town Center Blk. 1 Lot 3 Comerica Bank TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $3,375.00 $3,375.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,125.00 $1,125.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) $46.10 (100% due at Issuance of Water Meter) Water Meter Deposit $35.00 (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) $129.05 (100% due at Issuance of Water Meters) Irrigation Meter Deposit $35.00 (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee (100% due prior to Council Approval) Street Excrow $4,169.57 $4,169.57 (100% due prior to Council Approval) Construction Inspection Fee need submittal of (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $9,164.72 $8,669.57 II TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed.