Loading...
Town Center L3B1-CS 950705DATE: TO: FROM: RE: COPPELL ENGINEERING MEMORANDUM July 5, 1995 ~ Mike Martin, E.I.T. n~ - Howard Pafford, Utilities Superintende Development Fees for Town Center Blk. 1 Lot 3 Comerica Bank The following fees referenced project. Water Impact Fee: ~ - 1 - Total should be assessed and collected on the above 1 1/2" Domestic Meter/s = 5 ESU's 1 1/2" Irrigation Meter/s = 5 ESU's 10 ESU's @ $450.00 ea = $ 4.500.00 100% due prior to Council approval of the final plat. wastewater I~pact 1 - ~ 1/2" Domestic Meter/s = 5 ESU's Total 5 ESU's @ $450.00 ea = $ 2.250.00 100% due prior to Council approval of the final ~lat. Water Tap Inspection Fee Connections @ $100.00 each = S 200.00 100% due prior to issuance of..buildingpermit for residential, (Or in the case of multi-family, commercial, retail~~ industrial, fee is due prior to issuance of meter). Utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/lot = S 50.00 100% due prior to issuance of building permit. Development Fees Page 2 Water Meter Fee (Domestic) 1 - 1 1/2"' Domestic Meters @ $ 129.05ea = $ 129.05 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 1 1/2" Irrigation Meter/s @ S 129.05ea 100% due prior to issuance of water meter/s. = $ 29.05 Water Meter Deposit (Multi-F~m{ly or Non-Residential) i Meters @ $3~.00 ea = $ 35.00 100% due prior to issuance of water meters. Irrigation MeterDe~osit ~ Meters ~ $$$,Q0 ea = $ 35.00 100% due prior to issuance of water meters. Comerica Bank