Town Center L3B1-CS 950705DATE:
TO:
FROM:
RE:
COPPELL ENGINEERING
MEMORANDUM
July 5, 1995 ~
Mike Martin, E.I.T. n~
-
Howard Pafford, Utilities Superintende
Development Fees for Town Center Blk. 1 Lot 3
Comerica Bank
The following fees
referenced project.
Water Impact Fee:
~ -
1 -
Total
should be assessed and collected on the above
1 1/2" Domestic Meter/s = 5 ESU's
1 1/2" Irrigation Meter/s = 5 ESU's
10 ESU's @ $450.00 ea = $ 4.500.00
100% due prior to Council approval of the final plat.
wastewater I~pact
1 - ~ 1/2" Domestic Meter/s = 5 ESU's
Total 5 ESU's @ $450.00 ea = $ 2.250.00
100% due prior to Council approval of the final ~lat.
Water Tap Inspection Fee
Connections @ $100.00 each = S 200.00
100% due prior to issuance of..buildingpermit for residential, (Or in
the case of multi-family, commercial, retail~~ industrial, fee is due
prior to issuance of meter).
Utility Final Inspection Fee (Ail Development)
1 lots @ $50.00/lot = S 50.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Water Meter Fee (Domestic)
1 - 1 1/2"' Domestic Meters @ $ 129.05ea = $ 129.05
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - 1 1/2" Irrigation Meter/s @ S 129.05ea
100% due prior to issuance of water meter/s.
= $ 29.05
Water Meter Deposit (Multi-F~m{ly or Non-Residential)
i Meters @ $3~.00 ea = $ 35.00
100% due prior to issuance of water meters.
Irrigation MeterDe~osit
~ Meters ~ $$$,Q0 ea = $ 35.00
100% due prior to issuance of water meters.
Comerica Bank