Loading...
Verizon-CS 980929 r COPPELL, TEXAS 75019 RO. Box 478 Coppell, Texas 75019 972-462-0022 Gillett Berger The Beck Group 1700 Pacfic Avenue, Suite 3800 Dallas, TX 75201 September 29, ~998 GTE Shared Services Center Addition, Lot I, Block I (1-250,000 S.F. Building) Development Fee Assessment Dear Mr. Berger: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in thc amount of $321,975.00 and forward to the Finance Depa,taient along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to-Council approval.~ Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Dcpmunent will help us to verify thc payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Michael A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Gletm ~Iollowell, Assistant Director of Public Work~ Greg Jones, Chief Building Official Gary Siren, Director of Leisure Services DEVELOPMENT FEE TABLE Project: GTE Shared Services Center Addition, Lot 1, Block I (1-250,000 S.F. Building) Date: 9/22/98 TOTAL AMOLrNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $15,525.00 $15,525.00 (100% due prior to Council Approval) Water Tap Inspection Fee $300.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $384.30 (100% due at Issuance of Water Meter) Water Meter Fee Clrrigation/Fireline) $6,148.80 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $70.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $120.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $7,200.00 $7,200.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 ' (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $299,250.00 $299,250.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts I'OTAL $329,198.10 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $321,975.00 DEVELOPMENT FEE WORKSHEET PROJECT: GTE Shared Services Center Addition, Lot 1, Block 1 (1-250,000 S.F. Building) DATE: 9/22/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 2 - 2 inch = 16 ESU's 2 - 2 inch = 16 ESU's = ESU's 2 - 8 inch = 2.5 ESU's Total #: 34.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) $15,525.00 $300.00 $384.30 $384.30 $0.00 $5,764.50 $70.00 $120.00 $7,200.00 $100.00 $100.00 Water Tap Inspection Fee: Total #: 6 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 2 Domestic Meter(s) @ $192.15 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 2 Irrigation Meter(s) @ $192.15 Total #: 0 Additional Irrigation Meter(s) @ Total #: 2 Fireline Meter(s) @ $2,882.25 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 4 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 16 @ $450.00 ea. Wastewater Tap Inspection Fee: Total 0: 2 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ail developments): Total #: 2 Lots @ $50.00 ea. (100% due pdor to issuance of building permit) Page 3 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00/Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $299,250.00 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department, (2% of development cost required for private improvements) (4% of development cost raquirad for public improvements) Need submittal of development contracts Page 4 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: GTE Shared Services Center Addition, Lot 1, Block 1 (1-250,000 $.F. Building) 9/22/98 ROADWAY IMPACT FEE: Service Area * 1 Category ** Office Land Use ** General Office Building Building Size (Sq. Ft.) 250,000 Development Unita ** 250 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Uni~a) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $299,250.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)