Loading...
Town Center L3B1-CS 960116DEVELOPMENT FEES PROJECT NAME: ENGINEER: REVISION DATE: Town Center, Block 1, Lot 3 (Comercia Bank) Dowdey, Anderson & Associates 1/16/96 SENT 7/11/95 7/11/95 7/11/95 7/11/95 7/11/95 7/11/95 7/11/95 7/11/95 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Irrigation Street Escrow Street Cut Permit Overtime Inspection Water Tap Inspection UtiliW Final Inspection Water Meter (Domestic) Domestic Meter Deposit Water Meter Deposit Irrigation Meter Deposit TOTALS ASSESSED FEE AMOUNT PAID DATE $4,500.00 $4,500.00 9/22/95 $2,250.00 $2,250.00 9/22/95 $1,415.70 $1,415.70 12/14/95 $200.00 $200.00 12/14/95 $50.00 $50.00 12/14195 $129.05 $129.05 12/14/95 $35.00 $35.00 12/14/95 $129.05 $129.05 12/14/95 $35.00 $35.00 12/14/95 Total Fees Fees Paid Amount Owed $8,708.80 $8,708.80 $0.00 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint.