Townhouses-CS020110 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To:
From:
Date:
RE:
Garreth Campbell, Construction Inspector Engineering
James Andrews, Streets Division Public Works
January 10, 2002
Follow-up Walk-thru Townhonses of Coppell Drainage
The following items need to be done before Drainage can be released:
1. "Y" inlet box (junction box) at NE corner is in flood plain. Grout at box and RCP;
grout joints in RCP's; also has no plug.
2. "Y" inlet box (junction box) - remove dirt and mud; pour in a bottom to grade of
RCP's; grout RCP's at box.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
MESSAGE
CONF I RMAT I ON
01/10×0~ 1~:04
ID--CITY OF COPPELL
DATE
81/18
S,R-TIME
00'25"
DISTANT STATION ID MODE PAGES RESULT
992 304 9041 CALLING 01 OK 0000