We have reviewed the third submittal of the Villages of Coppell, Phase IliA
Gabion Wall Plan prepared by Don A. Tipton, Inc. The plans have been revised
in accordance with our previous review u~nts. However, several details
concerning this project still require attention:
1)
If Coppell Engineering is to provide the construction inspection of this
project, then the 2% construction inspection fee should be paid prior to
release of the construction plans.
2)
A determination should be made as to who is responsible for maintenance
of this facility. If it is the Homeowner's Association, then the
agreement should clearly indicate the maintenance responsibility. If it
is the individual property owners, then the plans should clearly indicate
as such and provide for a "Hold Harmless" statement to the City of
Coppell. Property owners should be formally notified of their
maintenance responsibility.
3)
This project is within a designated floodway and therefore requires a
flood plain development permit application.
4) This plan should include slope stability and foundation analysis by a
geotechnical engineer.
Ms. M. Shohre Daneshmand, P.E.
City of Coppell
November 18, 1991
Page No. 2
Please forward these comments along with the enclosed marked up review sets to
the Public Works, DRC Members for their review. We are available to discuss
this project further at your convenience.