Villages C PW-CS 911002SHIMEK, JACOBS & FINKLEA
CONSULTING ENGINEERS
WORKS
8333 Douslas Avenue, ~820
Dallas, Texas 75225
(214) 361-7900
ROSS L. IACOBS, RE.
I. C. FINKLEA, RE.
lAMES E. LAUGHLIN,
October 2, 1991
Ms. Shohr/Daneshmand, P.E. ~
Engineer~hg Department ~
City of/Coppell
Post O~ice Box 478
We have reviewed the second submittal of the final plat and construction plans
of the Villages of Coppell, Phase IIIB prepared by Don A. Tipton, Inc. for
Grand Homes, Inc.
The final plat has been revised in conformance with our earlier review
comments as indicated on the enclosed initial marked up set.
The construction plans, however, still require some revision in order to meet
the City's subdivision Regulations. We are enclosing a copy of the second
review set marked up with our co~ments. In general, the retaining wall along
Deforest Drive requires revision (see Sheet Nos. 9 & 10). In addition,
Standard Detail Sheet No. 20 is not included in this set. Please pass these
comments along with our marked up review set on to the Public Works DRC
Members for their review.
Further, our records indicate that the development fees of $47,368.37 for this
project have yet to be paid. Please review the development fee draft letter
filed in your office. You should find a draft letter ready for your signature
in that file.
We are available to discuss this review further at your convenience.
Sincerely,
Gary C. Hendricks, P.E.
Enclosure
cc: Ms/Tayron Bowman, Planning & Zoning Coordinator
~Pf~blic Works, DRC Members