Loading...
Townhouses-CS001012October 12, 2000 Craig Lemp C.N. Lemp Development, Inc. 4101 McEwen, Suite 110 Dallas, TX 75244 RE: Townhouses of Coppell ~--- Fee Assessment Letter Park Development Zone: Zone 2 Dear Mr. Lemp: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $265,721.00 and forward to the Finance Department along with a copy of the Fee Assessmem table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, l~ichael A. Marti , P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Debbie Ingrain, Secretary Glenn Hollowell, Assistant Director 0fPublie Works Greg ]'ones~ Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEES PROJECT NAME: ENGINEER: ORIG NAT ON DATE: Townhouses of Coppell 10/12/00 SENT L0/12/00 10/12/00 10/12/00 2%4% 10/12/00 2/8/01 3/19/01 5/7/01 5/14/01 5/21/01 6/4/01 ASSESSMENT Park Fee Waterlmpact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Roadway Impact-Zone Street Cut Permit Overtime Inspection Overtime Inspection Overtime Inspection Overtime Inspection Overtime Inspection Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS ASSESSED FEE $118,220.00 $50,175.00 $41,850.00 $35,364.00 $55,476.00 $240.00 $240.00 $120.00 $160.00 $240.00 $200.00 $4,800.00 $4,650.00 $2,471.01 $2,536.12 $3,255.00 $90.00 $4,650.00 TotalFees $324,737.13 AMOUNT PAID $118,220.00 $50,175.00 $41,850.00 noti~ street dept. $35,364.00 $55,476.00 $240.00 $240.00 $240.00 $200.00 $5o.oo $2,157.38 $30.00 Fees Paid $304,242.38 DATE 10/16/00 10/16/00 10/16/00 10/23/00 10/16/00 2/23/01 4/3/01 6/5/01 6/13/01 4/6/01 4/6/01 4/6/01 Amount Owed $20,494.75 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. PROJECT: DATE: DEVELOPMENT FEE WORKSHEET Townhouses of Coppell 10/12/00 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 93 - 5/8 inch X 3/4 inch = 93 ESU's 2 - 2 inch = 16 ESU's 0 = 0 ESU's I - 8 inch = 2.5 ESU's Total #: 111.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 96 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 93 Domestic Meter(s) @ $26.57 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) ~rrigationfFireline Water Meter Fee: Total #: 2 Irrigation Meter(s) @ $189.37 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: I Fireline Meter(s) @ $2,157.38 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total#: 93 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 93 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 93 Connections @ $50.00 ea. (100% due prior to issuance of building permit) ,"'~tility Final Inspection Fee (All developments): Total #: 93 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $50,175.00 $4,800.00 75o $2,471,01 $378.74 $0.00 $2,157,38 $3,255.00 $41,85O,OO $4,650.00 $4,650.00 Page 1 Project: Date: DEVELOPMENT FEE TABLE To~nhouses of Coppell 10/12/00 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $50,175.00 $50,175.00 (100% due prior to Council Approval) Water Tap Inspection Fee $4,800.00 (100% due at Issuance of Water Meter) --~ - Water Meter Fee (Domestic) $2,471.01 (I00 % due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,536.12 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $3,255.00 (100 % due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $41,850.00 $41,850.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $4,650.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $4,650.00 (100% due at Issuance of Building Permi0 Park Fee $118,220.00, $118,220.00 (100% due prior to Council Approval) Roadway Impact Fee $55,476.00 $55,476.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project Il Street Sign Fee Information not Available (100 % due prior to Acceptance of Project II Construction Inspection Fee Information not Available II TOTAL $288,173.13 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $265,721.00 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone: 0 Single-family @ $1,285.00 per lot 92 Multi-family @ $1,285.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Zone 2 $o.00 $118,220.00 $55,476.00 Information not Available ,,,.~treet Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Townhouses of Coppell DATE: 10/12/00 ROADWAY IMPACT FEE: Service Area * 7 Category ** Residential Land Use ** Multi-Family No. Lots/Units 92 Development Units ** 92.00 Vehicle Miles per Developmeat Unit ** 2.01 Fee per Vehicle Mile *** ~- $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $55,476.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) The City With A Basutlful Future P.O. Box 478 Coppell, Texas 75019 214-304-3545 Service Address I WATER TAP / METER '"SP. FEE SEWER TAP INSP. FEE UTILITY FINAL INSP. FEE SECURITY DEPOSITS-WATER WATER / SEWER SERVICE SALES WATER METER SALES REVENUE WATER TAP FEE SEWER TAP FEE CUSTOMER SERVICE INSPECTION BACKFLOW DEVICE REGISTRATION BACKFLOW DEVICE TESTED REGISTRATION METER TEST FEE Received By