Loading...
Villages C PW-CS 910614June 14, 1991 Ms. Shohre Daneshmond City of Coppell 255 Parkway Boulevard Texas 75019 VHJAGES OF COPPELL 3-A PUBL WORKS Dear Ms. Daneshmond: As requested, we are hereby committing to the following items in reference to the above mentioned project. Prior to City Acceptance of Villages of Coppell 3-A, an earthen channel will be constructed adjacent to Phase 3-B, discharging into Denton Creek. This plan will be prepared by Don A. Tipton, Inc. and approved by the City of Coppell. However, if Phase 3-B plans have been approved and construction is undeneay on Phase 3-B, the above mentioned channel will not be required. 2. No building permits will be allowed on Lots 8 through 15 and 42 through 46 of Block A until the Floodplain Study, prepared by Don A. Tipton, Inc., has been approved by the City of Coppell Engineering Department. We appreciate your attention in regard to these matters. Very truly yours, Vice President EDT/kid 8800 N. Central Expressway, Suite 330, Dallas, Texas 75231 (214) 750-6528 Fax (214) 750-6849