Villages C PW-CS 910614June 14, 1991
Ms. Shohre Daneshmond
City of Coppell
255 Parkway Boulevard
Texas 75019
VHJAGES OF COPPELL 3-A
PUBL WORKS
Dear Ms. Daneshmond:
As requested, we are hereby committing to the following items in reference to the above mentioned
project.
Prior to City Acceptance of Villages of Coppell 3-A, an earthen channel will be constructed
adjacent to Phase 3-B, discharging into Denton Creek. This plan will be prepared by Don A.
Tipton, Inc. and approved by the City of Coppell. However, if Phase 3-B plans have been
approved and construction is undeneay on Phase 3-B, the above mentioned channel will not
be required.
2.
No building permits will be allowed on Lots 8 through 15 and 42 through 46 of Block A until
the Floodplain Study, prepared by Don A. Tipton, Inc., has been approved by the City of
Coppell Engineering Department.
We appreciate your attention in regard to these matters.
Very truly yours,
Vice President
EDT/kid
8800 N. Central Expressway, Suite 330, Dallas, Texas 75231 (214) 750-6528 Fax (214) 750-6849