Loading...
Valley Ranch SS-CS 940228COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: February 28, 1994 Ken Griffin, P.E., City Engineer Howard L. Pafford, Utilities Superintendent Development Fees for Valley Ranch Self Storage The following fees have been revised per the developer's request to change the irrigation meter from 1%" to 1" and should be assessed on the above referenced project. Water Impact Fee: 1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's 1 - 1" Irrigation Meter/s = 2.5 ESU's 1 6" Fireline Meter/s 2.5 ESU's Total 6 ESU's @ $650.00 ea $3,900.00 100% due prior to Council approval of final plat. Wastewater Impact 1 100% - 5/8" x 3/4" Domestic Meter/s = 1 ESU's Total 1 ESU's ~ $450.00 ea = $450.00 due prior to Council approval of the final plat. Water Tap Inspection Fee 3 Connections ~ $100.00 each = $ 300.00 100% due prior to issuance of building permit. (Or in the irrigation meter-prior to issuance of meter). the case of Utility Final Inspection Fee 1 lot/s ~ $50.00 = $50.00 100% due prior issuance of building permit. Development Fees Page 2 Water Meter Fee 1 - 5/8" 100% due prior (Domestic) x 3/4" Domestic Meter Total $22.25 ea = $22.25 = $ 22.25 to issuance of building permit. Water Meter Fee 1 - 1" $ 46.10 1 - 6" Fireline Meter/s ~ $1,532.17 ea = Total 100% due prior to issuance of water meters. (Irrigation & Fire) · Irrigation Meter/s ea = $ 46.10 $1,532.17 $1,689.17 Water Meter Deposit 3 meters ~ $35.00 ea = $105.00 100% due prior to issuance of building permit. If you have any questions regarding this assessment please advise. HLP/dm xc: Steven G. Goram, Director of Public Works FEES/VALSTORE PROJECT NAME: Valley Ranch Self Storage ENGINEER: Brockett, Davis and Drake, Inc. REV SION DATE: 5/23/94 SENT ASSESSMENT ASSESSED FEE Park Fee Revised ** 3/3/94 Water Impact Fee * $3,900.00 Revised * * 3/3/94 Wastewater Impact Fee $450,00 Street Sign Street Light Construction Inspection Irrigation Street Escrow $281.68 Street Cut Permit 3/3/94 Overtime Inspection 3/3/94 Water Tap Inspection $300.00 3/3/94 Utility Final Inspection $50.00 3/3/94 Water Meter Fee(Lots) $22.25 3/3/94 Water Meter (Irrig. & Fire) $1,689.17 3/3/94 Water Meter Deposit $105.00 3/28/94 2" Water Relocation $449.39 Total Fees * TOTALS $7,247.49 AMOUNT PAID $3,900.00 $450.00 $281.68 $300.00 $50,00 $22.25 $1,689.17 $105.00 Fees Paid $6,798.10 DATE 3/10/94 3/10/94 3/14/94 3/10/94 3/10/94 3/10/94 3/10/94 3/1 O/94 Amount Owed $449.39 (w/plans) N/A 3/14/94 1/14/94 NOTES * Includes irrigation impact. * NOTE: Original assesment sent 2/11/94 for $5975.00 total fees.(See original assmnt.) Prior To Construction Erosion Control Approved E,P,A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. 3/31/94 Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint. DATE: TO: FROM: RE: COPPELL PUBLIC WORKS MEMORANDUM February 28, 1994 Ken Griffin, P.E., City Engineer Howard L. Pafford, Utilities Superintendent Development Fees for Valley Ranch Self Storage The following fees have been revised per the developer's request to change the irrigation meter from 1%" to 1" and should be assessed on the above referenced project. Water Impact Fee: 1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's 1 - 1" Irrigation Meter/s = 1 - Fireline Meter/s = 2.5 ESU's Total 6 ESU's @ $650.00 ea = $3,900.00 100% due prior to Council approval of final plat. 2.5 ESU's ~ Wastewater Impact 1 - 5/8" x 3/4" Domestic Meter/s = 1 Total 1 ESU's @ $450.00 ea = $450.00 100% due prior to Council ESU's approval of the final plat. Water Tap Inspection Fee 3 Connections @ $100.00 each = $ 300.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Utility Final Inspection Fee 1 lot/s @ $50.00 = $50.00 100% due prior issuance of building permit. Development Fees Page 2 Water Meter Fee (Domestic) 1 - 5/8" x 3/4" Domestic Meter Total $22.25 ea = $22.25 = $ 22.25 100% due prior to issuance of building permit. Water Meter Fee (Irrigation & Fire) 1 - 6" Irrigation Meter/~~. 46.10. ~ ~ Fireline Meter/s @ $1,~7 sa = Total 100% due prior to issuance of water meters. Water Meter Deposit 3 meters @ $35.00 ea = $105.00 100% due prior to issuance of building permit. If you have any questions regarding this assessment please advise. HLP/dm xc: Steven G. Goram, Director of Public Works FEES/VALSTORE