Valley Ranch SS-CS 940228COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
February 28, 1994
Ken Griffin, P.E., City Engineer
Howard L. Pafford, Utilities Superintendent
Development Fees for Valley Ranch Self Storage
The following fees have been revised per the developer's request to
change the irrigation meter from 1%" to 1" and should be assessed
on the above referenced project.
Water Impact Fee:
1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's
1 - 1" Irrigation Meter/s = 2.5 ESU's
1 6" Fireline Meter/s 2.5 ESU's
Total 6 ESU's @ $650.00 ea $3,900.00
100% due prior to Council approval of final plat.
Wastewater Impact
1
100%
- 5/8" x 3/4" Domestic Meter/s = 1 ESU's
Total 1 ESU's ~ $450.00 ea = $450.00
due prior to Council approval of the final plat.
Water Tap Inspection Fee
3 Connections ~ $100.00 each = $ 300.00
100% due prior to issuance of building permit. (Or in
the irrigation meter-prior to issuance of meter).
the case of
Utility Final Inspection Fee
1 lot/s ~ $50.00 = $50.00
100% due prior issuance of building permit.
Development Fees
Page 2
Water Meter Fee
1 - 5/8"
100% due prior
(Domestic)
x 3/4" Domestic Meter
Total
$22.25 ea = $22.25
= $ 22.25
to issuance of building permit.
Water Meter Fee
1 - 1" $ 46.10
1 - 6" Fireline Meter/s ~ $1,532.17 ea =
Total
100% due prior to issuance of water meters.
(Irrigation & Fire)
· Irrigation Meter/s
ea = $ 46.10
$1,532.17
$1,689.17
Water Meter Deposit
3 meters ~ $35.00 ea = $105.00
100% due prior to issuance of building permit.
If you have any questions regarding this assessment please advise.
HLP/dm
xc: Steven G. Goram, Director of Public Works
FEES/VALSTORE
PROJECT NAME: Valley Ranch Self Storage
ENGINEER: Brockett, Davis and Drake, Inc.
REV SION DATE: 5/23/94
SENT ASSESSMENT ASSESSED FEE
Park Fee
Revised **
3/3/94 Water Impact Fee * $3,900.00
Revised * *
3/3/94 Wastewater Impact Fee $450,00
Street Sign
Street Light
Construction Inspection
Irrigation
Street Escrow
$281.68
Street Cut Permit
3/3/94 Overtime Inspection
3/3/94 Water Tap Inspection $300.00
3/3/94 Utility Final Inspection $50.00
3/3/94 Water Meter Fee(Lots) $22.25
3/3/94 Water Meter (Irrig. & Fire) $1,689.17
3/3/94 Water Meter Deposit $105.00
3/28/94 2" Water Relocation $449.39
Total Fees *
TOTALS $7,247.49
AMOUNT PAID
$3,900.00
$450.00
$281.68
$300.00
$50,00
$22.25
$1,689.17
$105.00
Fees Paid
$6,798.10
DATE
3/10/94
3/10/94
3/14/94
3/10/94
3/10/94
3/10/94
3/10/94
3/1 O/94
Amount Owed
$449.39
(w/plans)
N/A
3/14/94
1/14/94
NOTES
* Includes irrigation impact.
* NOTE: Original assesment sent 2/11/94 for $5975.00 total fees.(See original assmnt.)
Prior To Construction
Erosion Control Approved
E,P,A.-N.O.I. Recd.
Const. Plan Approved
Irrigation Plan Recd.
Homeowner's Maint.
3/31/94
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Irrigation Plan Approved
Erosion Control Maint.
DATE:
TO:
FROM:
RE:
COPPELL PUBLIC WORKS
MEMORANDUM
February 28, 1994
Ken Griffin, P.E., City Engineer
Howard L. Pafford, Utilities Superintendent
Development Fees for Valley Ranch Self Storage
The following fees have been revised per the developer's request to
change the irrigation meter from 1%" to 1" and should be assessed
on the above referenced project.
Water Impact Fee:
1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's
1 - 1" Irrigation Meter/s =
1 - Fireline Meter/s = 2.5 ESU's
Total 6 ESU's @ $650.00 ea = $3,900.00
100% due prior to Council approval of final plat.
2.5 ESU's ~
Wastewater Impact
1 - 5/8" x 3/4" Domestic Meter/s = 1
Total 1 ESU's @ $450.00 ea = $450.00
100% due prior to Council
ESU's
approval of the final plat.
Water Tap Inspection Fee
3 Connections @ $100.00 each = $ 300.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Utility Final Inspection Fee
1 lot/s @ $50.00 = $50.00
100% due prior issuance of building permit.
Development Fees
Page 2
Water Meter Fee (Domestic)
1 - 5/8" x 3/4" Domestic Meter
Total
$22.25 ea = $22.25
= $ 22.25
100% due prior to issuance of building permit.
Water Meter Fee (Irrigation & Fire)
1 - 6"
Irrigation Meter/~~. 46.10. ~ ~
Fireline Meter/s @ $1,~7 sa =
Total
100% due prior to issuance of water meters.
Water Meter Deposit
3 meters @ $35.00 ea = $105.00
100% due prior to issuance of building permit.
If you have any questions regarding this assessment please advise.
HLP/dm
xc: Steven G. Goram, Director of Public Works
FEES/VALSTORE