Valley R Center-CS 971111DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
REV S ON DATE:
Video Update, Valley Ranch Center Lot B-R-2, Block 1
Urban Architecture
11/11/97
SENT
4/25/97
4/25/97
4/25/97
ASSESSMENT
Park Fee
Water Impact ($3,375.00)
Wastewater Impact Fee
Street Sign
Street Light
Construction Inspection
Roadway Impact-Zone 8
Street Cut Permit
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
TOTALS
ASSESSED FEE
AMOUNT PAID
DATE
$879.78 $879.78 7/2/97
$2,250.00 $2,250.00 7/2/97
notify street dept.
$479.80 9479.80
92,084.88 92,084.88
7/2/97
7/2/97
$50.00 950.00 7/2/97
91,494.15 $1,494.15 7/2/97
930.00 $30.00 7/2/97
935.00 $35.00 7/2/97
Total Fees Fees Paid Amount Owed
97,303.61 97,303.61 90.00
NOTES
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
Irrigation Plan Recd.
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Irrigation Plan Approved
Erosion Control Maint.