Loading...
Valley R Center-CS 971111DEVELOPMENT FEES PROJECT NAME: ENGINEER: REV S ON DATE: Video Update, Valley Ranch Center Lot B-R-2, Block 1 Urban Architecture 11/11/97 SENT 4/25/97 4/25/97 4/25/97 ASSESSMENT Park Fee Water Impact ($3,375.00) Wastewater Impact Fee Street Sign Street Light Construction Inspection Roadway Impact-Zone 8 Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS ASSESSED FEE AMOUNT PAID DATE $879.78 $879.78 7/2/97 $2,250.00 $2,250.00 7/2/97 notify street dept. $479.80 9479.80 92,084.88 92,084.88 7/2/97 7/2/97 $50.00 950.00 7/2/97 91,494.15 $1,494.15 7/2/97 930.00 $30.00 7/2/97 935.00 $35.00 7/2/97 Total Fees Fees Paid Amount Owed 97,303.61 97,303.61 90.00 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint.