Valley R Center-CS 970425The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462~0022
April 25, 1997
Brian Miller
Urban Architecture
7001 Preston Road, Suite 210
Dallas, TX 75205
Valley Ranch Center, Lot B-R-2, Block 1 (Video Update)
Development Fee Assessment
Dear Mr Miller:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make paymem to thc City of Coppell in the amount of $7,709.88 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Deparunent will help us to verify thc
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Kenneth M. Griffin, P.E.
Director of Engineering & Public Works
Cc:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Valley Ranch Center, Lot B-R-2, Block 1 (Video. Update)
Date: 4/25/97
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $3,375.00 $3,375.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $144.38
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $1,494.15
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $35.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permi0
Park Fee N/A
(100% due prior to Council Approval)
Roadway Impact Fee $2,084.88 $2,084.88
(100% due prior to Council Approval)
Street Light Fee N/A
(100% due prior to Acceptance of Project
Street Sign Fee N/A
(100% due prior to Acceptance of Project
Construction Inspection Fee Need submittal of
development contracts
I'OTAL $9,613.41
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $7,709.88
DEVELOPMENT FEE WORKSHEET
PROJECT: Valley Ranch Center, Lot B-R-2, Block 1 (Video Update)
DATE: 4/25/97
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
I - 1 1/2 inch = 5 ESU's
= ESU's
= ESU's
1 - 6 inch = 2.5 ESU's
Total #: 7.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
{Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter{s) @ $144.38
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 0 Irrigation Meter(s) @
Total 8: 0 Additional Irrigation Meter{s) @
Total #: 1 Fireline Meter(s) @
{100% due prior to issuance of water meters)
$1,494.15
Water Meter Deposit Fee (Domestic):
Total #: I Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter{s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
@$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
{100% due prior to issuance of building permit)
$3,375.00
$100.00
$144.38
$0.00
$0.00
$1,494.15
$30.00
$35.00
$2,250.00
$50.00
$50.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$2,084.88
N/A
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
N/A
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submiUal of
development contracts
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Valley Ranch Center, Lot B-R-2, Block 1 (Video Update)
4/25/97
ROADWAY IMPACT FEE:
Service Area * 8
Category ** Commercial
Land Use **
Building Size (Sq. Ft.)
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles Per Development Unit) x (Fee per Vehicle Mile) =
Others / Not Specified (Commercial)
6,000
6
4.76
$73
$2,084.88
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)