Loading...
Villages C PW-CS 900508Nay 8, The City With A Beautiful Future 1~90 COPY P.O. Box 478 Coppell. Texas 75019 214-462~0022 Mr. william L. Wallace, P.E. Three North Park 8800 N. Central Expressway, Suite/ 300 Dallas,~/Texas 75~1 __~/ RE.-~s of_Coppel!, Phase I~3~ Existing Floodplain Study o .: 84-10-054 ' Dear Mr. Williams: Your above referenced project has been reviewed byMr. Ron Morrison with Kimle¥-Horn & Associates on behalf of the City of Coppell. Enclosed please find a copy of Mr. Morrison's review letter dated April 4, 1990. As stated by Mr. Morrison this is not a "final as- built study", and it is only considered as an "interim as-built" floodplain study. Please note that we concur with you that all finished floors will be elevated tWo (2) feet above the existing condition flood levels, and it complies with the city's requirement. Please let me know if you have any questions. Sincerely, ;4.Shohre Daneshmand / ~£. Acting City Engineer MSD/sm cc:/Steven G. Goram, Director of Public works Ed Toole, The Brooks Company Pat Atkins, Don Tipton John Karlshurer, Ginn, Inc. WALLACE Kimley-Horn and Associates, loc, April 2, 1990 &..Is. Shohre Dancshmand ,:xcting C,.y Engineer ;ity of Coppetl i'nst Office [:OX ,178 Coppcll, Texas 75019 .j~ Itc: Review of Villages of Coppcll PhasejExistlng Floodplain Study Dear Ms. Daneshntand: [7/' Our review of the Villages of £.oppell· Phase;~5~Floodplain Study has been completed. Before presenting the results, the purpose of the study should be explained. This study could be t,:~med an "Interim As~bnilt" floodplain study. It is not a final as-built study because there is additional work left to do at the site. For this reason, the study does not need to address the requirements of a final study. "'!m mcdets presented in the subject study did not match those presented in the Phase I Master Drainage Plan; which is, at present, the basis of comparison for all new studies. 'rh~,. .~ ,qox .... 't~o"q ...... ':, n,l ~,...;:-~-h~'--'~. ~, ~.r~o,.,,.~'" ~"~'""'~ u,' ' thc rcveixvcd study:~, crc' ,~o npa~ eu to thc elevation and discharge presented in the recently completed Master Drainage Plan Phase 1. The table below shows the result of this comparison. Elm fork Trinity River 100-year Flood Level Comparison Crt ss Villages Study Master Plan Sections Existieg Ultimate Existing Ultimate 1000 + 40 ,1,17.09 ,147.59 ,147.06 ,147.52 1030 + 60 448.49 ,48.97 448.45 448.87 1060 + g0 451.52 451.95 451.09 451.47 Thc Denton Crr,~k Mode[ used in the study matches thc Master Plan model. - 2 - April 2, 1990 The ~ubject study states that ail finished floors will be elevated 2 feet above the existing condltJm~ flood levels. Because this is higher than l-foot above the ultimate condition flood lev:;is, it complies with City requirements. The elevations shown t'or the Elm Fork Trinity nmdel z, re higher than those shown for the Master Plan conditions, thus, the proposed project .L,' ept:~ble b~sed on that model. 'lc:u,e call if you need additional information. Sincerely, KIMLEY-HORN AND ASSOCIATES, ]NC,'. Ronald W. Morrison, P.E. Senior Ilydrologist