Loading...
TR9501-CS 961119The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 November 19, 1996 Seyed M. Mirtaheri, Vice President Integrated Roadway Services, Inc. 10701 Shady Trail Dallas, TX 75220 RE: Traffic Signal Installations Project TR 95-01 / MacArthur Blvd. at Parkway Blvd. Dear Mr. Mirtaheri: At the November 12, 1996 City Council meeting, the referenced project was awarded to your firm. Enclosed with his letter are three copies of the contract signed by the Mayor. Please sign the three copies, provide the required bonds and return two of the copies to the Engineering Department. One of the copies is for your record. Once the contracts have been signed and returned to our office, a preconstruction meeting will be scheduled and a notice to proceed letter will be issued. The inspector on this project will be Larry Davis. If you should have questions concerning this project please feel free to contact Larry or myself at 304-3679. Sincerely, Kenneth M. Griffin, P.E. Director of Public Works / City Engineer cc: Larry Davis, Construction Inspector