Loading...
TR9501-CS 961217To: From: RE: Date: Integrated Roadway Services, Inc. / FAX (214)352-1938 Atul Patel, E.I.T., Graduate Engineer Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services Cary Fitzgerald, CMA / FAX (214)934-8094 Larry Davis, Construction Inspector~ a ~C Preconstruction Meeting for TR 95-01 Traffic Signal ln.qallations/ MacArthur Blvd at Parkway Blvd. December 17, 1996 A preconstruction conference for the referenced project has been scheduled for Friday, December 20, 1996 at 2:00 p.m. in the 2nd floor conference room at Town Center, 255 Parkway Blvd. If you should have any questions concerning this project, please feel free to call me. cc: Ken Griff'm, Dir. of Public Works/City Engineer file/ldavis/0pre-con.mm