TR9501-CS 961217To:
From:
RE:
Date:
Integrated Roadway Services, Inc. / FAX (214)352-1938
Atul Patel, E.I.T., Graduate Engineer
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
Cary Fitzgerald, CMA / FAX (214)934-8094
Larry Davis, Construction Inspector~ a ~C
Preconstruction Meeting for TR 95-01 Traffic Signal ln.qallations/
MacArthur Blvd at Parkway Blvd.
December 17, 1996
A preconstruction conference for the referenced project has been scheduled for Friday,
December 20, 1996 at 2:00 p.m. in the 2nd floor conference room at Town Center, 255
Parkway Blvd.
If you should have any questions concerning this project, please feel free to call me.
cc: Ken Griff'm, Dir. of Public Works/City Engineer
file/ldavis/0pre-con.mm