Loading...
Trinity Shores-CS021031 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: Garreth Campbell, Engineering Dept. Danny Hightower, Utilities Dept. October 31, 2002 Trinity Shores Walkthru From 10/30/02 1. First MLV needs pad and lid painted blue. 2. First FH needs pad and lid painted red. 3. Paint all manhole lids red. 4. Lot 3 sewer clean-out, straighten pipe. 5. Second manhole needs rain pan and lid painted red. 6. All FH need blue marker buttons in street. 7. Last FH needs PSI test on follow-up. 8. Third manhole needs rain pan and lid painted red. 9. Repair blocking at last FH. 10. Lot 7 sewer clean-out, straighten pipe. 11. Fifth manhole needs rain pan and lid palmed red. 12. Fourth manhole needs and lid painted red. 13. Manholes 4 and 5 need backfill to ground level. Call Danny Hightower at 972-304-3545 to schedule follow-up on punch list. CITY OF COPPELL PUBLIC WORKS DEPARTMENT MESSAGE CONF I RMAT I ON 11/01/02 09:12 ID--CITY OF COPPELL DATE 11×01 S,R-TIME DISTANT STATION ID MODE PAGES 00'25" 9?2 304 7041 CALLING 01 RESULT OK 0000