Trinity Shores-CS021031 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To:
From:
Date:
RE:
Garreth Campbell, Engineering Dept.
Danny Hightower, Utilities Dept.
October 31, 2002
Trinity Shores Walkthru From 10/30/02
1. First MLV needs pad and lid painted blue.
2. First FH needs pad and lid painted red.
3. Paint all manhole lids red.
4. Lot 3 sewer clean-out, straighten pipe.
5. Second manhole needs rain pan and lid painted red.
6. All FH need blue marker buttons in street.
7. Last FH needs PSI test on follow-up.
8. Third manhole needs rain pan and lid painted red.
9. Repair blocking at last FH.
10. Lot 7 sewer clean-out, straighten pipe.
11. Fifth manhole needs rain pan and lid palmed red.
12. Fourth manhole needs and lid painted red.
13. Manholes 4 and 5 need backfill to ground level.
Call Danny Hightower at 972-304-3545 to schedule follow-up on punch list.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
MESSAGE
CONF I RMAT I ON
11/01/02 09:12
ID--CITY OF COPPELL
DATE
11×01
S,R-TIME DISTANT STATION ID MODE PAGES
00'25" 9?2 304 7041 CALLING 01
RESULT
OK 0000