TR9101-CS 910315Barton-Aschman Associates, Inc.
5485 Belt Line Road
Suite 199
Dallas, Texas 75240
Telephone #: (214) 991-1900
FAX #: (214) 490-9261
TO M~ Shobre Daneshm~nd
City Engineer
City of Coppell
GENTLEMEN:
WE ARE SENDING YOU
[] Shop drawings
[] Copy~ I~ter
[] Attached
[] Pdnts
[] Change order
~TE JOB ~.
3/15/91 3311.03.01
ATT~TION
M. S. Daneshmand
RE:
Traffic Signal Design
Denton Tam
[] Under separate coy items:
[~ Plans [] Samples ~ Specifications
COPIES ~ NO. DESCRIPTI~
3 2/91 Traffic Siqnal Construction Plans
3 2/91 Contract Documents and Specifications
1 Prospeot~v~ Ridd~rm I.i~ - g~on~]
THESE ARE TRANSMITTED as checked below:
[] For approval ~ Approved as submitted
J~ For your use [] Approved as noted
[] As requested [] Returned for corrections
[] For review and comment []
:~ FOR BIDS DUE March 26,
[] Resubmit
[] Submit
[] Return
copies for approval
copies for distribution
corrected pdnts
19 9 1__ ~J PRINTS RETURNED AFTER LOAN TO US
REMARKS
We are submittinq~ for your use~ final Plans and gpea~fiaaf~n~
for the above referenced project. We have additional copies at our
office for pick up by prospective bidders. We mailed ~he "Advertisement
for Bids" to the Contractors on the attached l~st on M~roh 15~ 19q1_
Please call us if you hav~ any que~t~n~ ~r aomment~.
COPY TO
If enclosures are not as noted, kindly notify us at once.
e
o
o
PROSPECTIVE BIDDERS LIST
Signal Contractors
Sharrock Electric, Inc.
714 West Davis Street
Dallas, TX 75208
Metro 263-89044/(214) 946-5116
Attn: Mr. Bob White
Georgia Electric Co.
P.O. Box 3108
Albany, GA 31708
(912) 435-2241
Attn: James.R. Hall
Sig-Op Systems, Inc.
P.O. Box 454
Edmond, OK 73083
(405) 341-3101
Attn: Dan Meadors
Mica Corporation
P.O. Box 14350
Ft. Worth, TX 76117
(817) 429-3862
Riley Electric
4000 W. Vickery
Ft. Worth, TX 76107
(817) 451-7928/737-7214
Attn: Charlie Lipsey
Durable Specialties, Inc.
P.O. Box 381788
Duncanville, TX 75~38
(214) 296-6324
Attn: Jeff Bryan
Innovated Systems Co., Inc.
1132 East Highway 80
Mesquite, TX 75150
(214) 289-6620
Attn: Lou Bridges
10.
11.
12.
13.
14.
Fischbach and Moore, Inc.
11050 Ables Lane
P.O. Box 59997
Dallas, TX 75229-1997
(214) 241-4282
Attn: Gary Pustejovsky
Michelle Electric
P.O. Box 733
Baytown, TX 77522-0733
(713) 422-0793
Attn: Budy Jarvis
Vaught Electric
3916 Perkins Rd.
Arlington, TX 76015
(817) 451-6937
Attn: Jack S. Vaught
(Street Lighting & Electical)
Austin Traffic Signal
P.O. Box 130
Roundrock, TX 78680
(512) 255-9951
Tommy Willis Electric
P.O. Box 7109
Abilene, Texas 79608
Pfeiffer Electric
P.O. Box 230125
HoUston, TX 77223
(713) 228-9615
Attn: Arnold Pfeiffer
Fred Randall Co.
P.O. Box 160
Deer Park, TX 77536
(713) 479-8765
Attn: Fred Randall
15.
Traffic Maintenance and
Construction
P.O. Box 330158
Houston, Texas 77233-0158
(713) 991-1157
ATYN: Paul Jagger
Barton-Aschman Associates, Inc.
5485 Belt Line Road, Suite 199
Dallas, Texas 75240
USA
Phone: (214) 991-1900
Fax: (214) 490-9261
Metro: 263-9138
To:
From:
Date:
Subject:
MEMORANDUM
Ms. M. Shohre Daneshmand, P.E.
Acting City Engineer
City of Coppell
Donald R. Glenn, P.E.
Barton-Aschman Associates, Inc.
m,, mm,
March 18, 1991
Project Status Report
Signal Design - Denton Tap Road/Bethel Road
Barton-Aschman completed the final Plans and Specifications for the above referenced
project on March 14, 1991 as per the City's final review comments dated March 13, 1991.
The project is currently being advertised for bids with a bid opening date set for March 26,
1991 at 10:00 a.m. Unless the successful Bidder experiences delays in negotiating a contract
with the City or in getting equipment (traffic signal poles, signal heads, etc.), we estimate
that the signal installation will be completed by mid-June 1991.
During the design phase of this project, slight delays were encountered due to the
uncertainty of the existing and/or proposed right-of-way for the west side of the intersection.
The objective of the City's engineering staff and Barton-Aschman was to obtain as much
information as possible so that the location of the traffic signal poles would be designed as
to negate or minimize relocation due to the future widening of Bethel Road to the west.
DRG:sik
don\sigstatus.mem