COPPELL PUBLIC WORKS
MEMORANDUM
December 29, 1993
Ken Griffin, P.E.,
Howard L. Pafford,
City Engineer
Utilities Superintendent ~
Development Fees for Valley Rancy Baptist Church
fees should be assessed on the above referenced
Water Impact Fee:
1 - 2"
1 - 1"
1 - 6"
Total 13
Domestic Meter/s =
Irrigation Meter/s =
Fireline Meter/s =
ESU's @ $650.00 ea
100% due prior to Council
8 ESU's
2.5 ESU's
2.5 ESU's
= $8,450.00
approval of final plat.
Wastewater Impact
1 - 2"
Total 8
100% due prior to Council
Domestic meters = 8 ESU's
__ ESU's @ $450.00 ea = $3,600.00
approval of the final plat.
Water Tap Inspection Fee
3 Connections @ $100.00 each = $ 300.00
100% due prior to issuance of building permit. (Or in the case
the irrigation meter-prior to issuance of meter).
of
Utility Final Inspection Fee
1 lots @ $50.00 = $50.00
100% due prior issuance of building permit.
Development Fees
Page 2
Water Meter Fee (Domestic)
1 - 2" Domestic Meter
100% due prior to issuance
$296.84 ea = $296.84
Total = $ 296.84
of building permit.
Water Meter Fee
1 1"
I - 6" Fireline Meter/s @ $1,532.17 ea
Total
100% due prior to issuance of water meters.
(Irrigation & Fire)
Irrigation Meter/s @ $62.10 ea = $62.10
= $1,532.17
$1,594.27
Water Meter Deposit
3 meters @ $35.00 ea = $105.00
100% due prior to issuance of building permit.
If you have any questions regarding this assessment please advise.
HLP/dm
xc: Steven G. Goram, Director of Public Works
FEES/VALYCHUR