Loading...
Valley R Baptist-CS 940413/~ The City With A Beautiful Futu,,L.~ '?/;¥~ [~: 1994 PUBLIC WORKS April 13, 1994 Mr. Greg Yancey Valley Ranch Baptist Church 1805 Royal l~r~e Suite 107 Dallas, Texas 75229 PO Box 478 Coppelt, Texas 75019 214-462-0022 RE: Valley Ranch Baptist Church Revised Development Fee Calculations Dear Mr. Yancey: Enclosed is a copy of the Public Works Department revised Development Fee Calculations for Valley Ranch Baptist Church. As shown on the attached sheet, the water meter fee was incorrectly calculated as a 6" meter instead of an 8" meter. The revision increased the water meter fee from $1,594.27 to $2,464.20. Please provide a check made payable to the City of Coppell in the amount of $869.93 for the difference and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Revised Development Fee calculations. We are sorry for the inconvenience and if you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician COPPELL PUBLIC WORKS MEMORANDUM APR - 8 199 DATE: April 7, 1994 TO: Engineering Staff FROM: Public Works Staff RE: Revised Develmpment Fees for Valley Ranch Baptist Church The following fees should be assessed on the above referenced project. Water Impact Fee: 1 - 2" Domestic Meter/s = 8 ESU's 1 - 1" Irrigation Meter/s = 2.5 ESU's 1 - 8" Fireline Meter/s = 2.5 ESU's Total 13 ESU's @ $650.00 ea = $8,450.00 100% due prior to Council approval of final plat. Wastewater Impact 1 2" Total 8 100% due prior to Council Domestic meters = 8 ESU's ESU's @ $450.00 ea = $3,600.00 approval of the final plat. Water Tap Inspection Fee 3 Connections @ $100.00 each = $ 300.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Utility Final Inspection Fee 1 lot/s @ $50.00 = $50.00 100% due prior issuance of building permit. Development Fees Page 2 Water Meter Fee 1 - 2" (Domestic) Domestic Meter $296.84 ea = $296.84 Total = $ 296.84 100% due prior to issuance of building permit. Water Meter Fee 1 - 1 - 8" Fireline Meter/s @ $2,402.10 ea Total 100% due prior to issuance of water meters. (Irrigation & Fire) 1" Irrigation Meter/s @ $62.10 ea = $62.10 = $2,402.10 $2,464.20 Water Meter Deposit 3 meters @ $35.00 ea = $105.00 100% due prior to issuance of building permit. If you have any questions regarding this assessment please advise. HLP/dm xc: Steven G. Goram, Director of Public Works FEES/VALYCHUR