Valley R Baptist-CS 940211The City With A Beautiful Futu e
February 11, 1994
Mr. Mark Roberts
Brockett, Davis and Drake Inc.
3535 Travis Suite 100
Dallas, Texas 75204
P.O. Box 478
Coppell, Texas 75019
214-462-0022
RE: Valley Ranch Baptist Church
Development Fee Assessment
Dear Mr. Roberts:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee Calculations for Valley Ranch Baptist Church.
Please provide a check made payable to the City of Coppell in the amount of $12,050.00 and
forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment
List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the
construction inspection fee can be verified.
By providing a copy of your paid receipt to our office, it will help us to verify payment of the
required fees and insure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
Steve Goram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
February 11, 1994
Valley Ranch Baptist Church
TOTAL A_MOUNT DUE
ASSESSMENT PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $8,450.00 $8,450.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $300.00 -0-
(100%due at Issuance of Building Permit)
Wastewater Impact Fee $3,600.00 $3,600.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee -0- -0-
(100%due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00 -0-
(100%due at Issuance of Building Permit)
Water Meter Fee (Lots) $296.84 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Irrigation & Fire) $1,594.27 -0-
(100% due at Issuance of Water Meters)
Water Meter Deposit $105.00 -0-
(100%due at Issuance of Building Permit)
Irrigation Meter Deposit -0- -0-
(100%due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(100%due prior to Acceptance of Project)
Street Light Fee * -0-
(100%due prior to Acceptance of Project)
Park Fee -0- -0-
(50% due prior to Council Approval)
(50%due prior to Issuance of Building Permit)
TOTAL $14,396.11
TOTAL AMOUNT DUE PRIOR TO $12,050.00
COUNCIL APPROVAL
Construction Inspection Fee
(2% of Project Cost due prior to
preconstruction meeting)
This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project.
Once the plan is submitted, $292.60 per light will be assessed.
~0:18
005
PUJ - 9
COPPEL~ PUBLZ¢ WORKS
MEWORANDUM
DATE: December- 29, 1993
fr~: K~n Griffi;;, P.E.,
FROM: Howard L. Pafford,
RE:
City Engineer .
Utilities Superzntendent ~
Development Fees for Valley Rancy Baptist Church
The following fees should be assessed on the above ~-eferenced
project.
Weter Isp~ Fee;
- 1"
' 6"
Total
13
100% due prior to Council
Domestic Meter/s - 8 ESU's
Irrigation Meter/s ~ 2.5 ESU's
Fireline Meter/s - ~ ESU's
ESU's ~ $650.00 ea = $8.450.0Q
approval of final plat.
Wastewater Zmpaat
Total 8
i00% due prior to Council
Domestic meters ~ ~ ESU's
__ ESU's ~ $450.00 ea ~ $3.600.00
approval of the final plat.
Water Tap Inspection Fee
3 Connections ~ $100.00 each ~ $ $00.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
UtllityFinal Inspection Fee
~ lots ~ $50.0~., = $50.00
100% du~ prior issuance cf building permit.
Water Neter Fee
Develop~en~ Fuos
Page 2
Domestic Meter ~ $296.84. e~, = $296.84
Total = $ 296.84
100% due prior to issuance of building permit.
Water Weter Fee (Irrigation & Fire}
~ L $" Irrigation Meter/s ~ $62.1Q
~, - ~" Firoline Meter/s ~
Total
100% due prior to issuance of water meters.
Water Wete=D~it
3 meters ~ $~5.oo ea ~ ~10~.oo
lOO% due prior to issuan¢~ of building p~rmit.
If you have any questions regarding this assessment plsnse advise.
BLP/dm
xc: Steven G. Gora;~, Director of l~bli¢ Works