Valley R Baptist-CS 940407COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
The following
project.
April 7, 1994
Engineering Staff
Public Works Staff
Revised Develmpment Fees for Valley Ranch Baptist Church
fees should be assessed on the above referenced
Water Impact Fee:
1 - 2"
1 - 1"
1 - 8"
Total 13
100% due prior to Council
Domestic Meter/s = 8 ESU's
Irrigation Meter/s = 2.5 ESU's
Fireline Meter/s = 2.5 ESU's
ESU's @ $650.00 ea = $8,450.00
approval of final plat.
Wastewater Impact
1 - 2"
Total 8
100% due prior to Council
Domestic meters = 8 ESU's
ESU's ~ $450.00 ea = $3,600.00
approval of the final plat.
Water Tap Inspection Fee
3 Connections @ $100.00 each = $ 300.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Utility Final Inspection Fee
1 lot/s @ $50.00 = $50.00
100% due prior issuance of building permit.
Development Fees
Page 2
Water Meter Fee (Domestic)
1 - 2" Domestic Meter @ $296.84 ea = $296.84
Total = $ 296.84
100% due prior to issuance of building permit.
Water Meter Fee
1 -
1 - 8" Fireline Meter/s @ $2,402.10 ea
Total
100% due prior to issuance of water meters.
(Irrigation & Fire)
1" Irrigation Meter/s @ $62.10 ea = $62.10
= $2,402.10
$2,464.20
Water Meter Deposit
3 meters @ $35.00 ea = $105.00
100% due prior to issuance of building permit.
If you have any questions regarding this assessment please advise.
HLP/dm
xc: Steven G. Goram, Director of Public Works
FEES/VALYCHUR