Loading...
Valley R Baptist-CS 940407COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: The following project. April 7, 1994 Engineering Staff Public Works Staff Revised Develmpment Fees for Valley Ranch Baptist Church fees should be assessed on the above referenced Water Impact Fee: 1 - 2" 1 - 1" 1 - 8" Total 13 100% due prior to Council Domestic Meter/s = 8 ESU's Irrigation Meter/s = 2.5 ESU's Fireline Meter/s = 2.5 ESU's ESU's @ $650.00 ea = $8,450.00 approval of final plat. Wastewater Impact 1 - 2" Total 8 100% due prior to Council Domestic meters = 8 ESU's ESU's ~ $450.00 ea = $3,600.00 approval of the final plat. Water Tap Inspection Fee 3 Connections @ $100.00 each = $ 300.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Utility Final Inspection Fee 1 lot/s @ $50.00 = $50.00 100% due prior issuance of building permit. Development Fees Page 2 Water Meter Fee (Domestic) 1 - 2" Domestic Meter @ $296.84 ea = $296.84 Total = $ 296.84 100% due prior to issuance of building permit. Water Meter Fee 1 - 1 - 8" Fireline Meter/s @ $2,402.10 ea Total 100% due prior to issuance of water meters. (Irrigation & Fire) 1" Irrigation Meter/s @ $62.10 ea = $62.10 = $2,402.10 $2,464.20 Water Meter Deposit 3 meters @ $35.00 ea = $105.00 100% due prior to issuance of building permit. If you have any questions regarding this assessment please advise. HLP/dm xc: Steven G. Goram, Director of Public Works FEES/VALYCHUR