Valley R Baptist-CS 940921DATE:
TO:
FROM:
RE:
COPPELL PUBLIC WORKS
MEMOP~-NDUM ~~
September 21, 1994 ~ ~
Garreth Cambell, Construction Inspect
Howard Pafford, Water Utilities S~erintendent ,
Final Walk-Through on~l~y Ranch Baptist Chu~
A final walk - thru was conducted on the above referenced project
this morning and no items were found to be deficient. All items
pertaining to a water utility walk - thru were found to be
acceptable.
I appreciate your cooperation in having the contractor prepared
for this walk - thru.
HLP/hlp