Loading...
Valley R Center-CS 890713ALBERT H. HALFF ASSOCIATES, INC. ENGINEERS · SCIENTISTS · SURVEYORS DALLAS * ARLINGTON · CHICAGO · FORT WORTH 8616 NORTHWEST PLAZA DRIVE · DALLAS, TEXAS 75225 214/739 0094 City of Coppell P. O. Box 478 Coppeil, Texas 75019 )~ Attention: Mr. Rus? D_o;le, P.E. Re: Construction Plans For The Southeast Comer Of MacArthur Boulevard And Beltline Road Dear Mr. Doyle: July 13, 1989 AVO 1006 On December 22, 1987, Halff Associates obtained approval from the City of Coppell for the construction plans prepared for the above referenced site. As the developer of the site has failed to pay for the work. Halff Associates has withheld delive~j of the approved plans until payment is made. The developer of the property retained a new engineer to provide a set of construction plans for the referenced property. The new engineer prepared a revised set of construction plans and referenced the original plans prepared by Halff Associates. Halff Associates takes issue with the statement on the new plans which references the original plans prepared by Halff Associates. The Texas Engineering Practice Act, in the section entitled Professional Conduct and Ethics, subsection 131.152-j, defines the process to be used in situations such as exist here. The applicable section is given below. 0) The engineer shall submit to a client only that work (plans, specifications, reports, etc.) done by him or under his responsible supervision; however, an engineer, as a third party, may complete, correct, revise, or add to the work of another engineer when engaged to do so by a client, provided: ¢) the client furnishes the documentation of such work submitted to him by the first engineer; (2) the first engineer is notified in writing by the second engiineerof the engagement referred to in paragraPh (1) of this subsection immediately upon acceptance of the engagement; and TRANSPORTATION STRUCTURAL WATER RESOURCES LAND DEVELOPMENT MUNICIPAL ENVIRONMENTAL SURVEYING GLOBAL POSITIONING SYSTEM (GPS) REMOTE SENSING AND MAPPING LANDSCAPEARCHITECTURE PLANNING ill ALBERT H. ENGINEERS HALFF ASSOCIATES, INC. · SCIENTISTS · SURVEYORS City Of Coppell July 13, 1989 Page 2 (3) any work completed, corrected, revised, or added to shall have a seal affixed by and become the responsibility of the second engineer. Halff Associates has not been notified in writing by the developer's current engineer that our approved plans have been modified or are being used in any capacity. Please call with any questions. GK/vdw Sincerely, ALBERT H. HALFF ASSOCIATES -/~,: gory Kuhn, P.E.