Valley R Center-CS 880718 GINN,
July 18, 1988
CO UI;FING EN(;INEERS
Mr. Steve Lemke
Dunaway & Associates
~&~0 Ier ~~~ Plaza
~: Valley.Ranch Center ~
{ Belt Line at MacArthur Blvd.~
As ~ our phone conversation thy date, we are transmitting a
set of~p~of the proposed~La~ and profile of Belt Line Road,
from MacArthu~cvard ea~st. This proposed road fronts the
Valley Ranch Center property of Dunning Development.
It is our understanding, from Mr. Pat Donovan of Dunning
Development, that your firm will be doing the construction
administration on the development. We are sending the plans to
help coordinate the grades of the proposed improvements and the
Albert Halff engineered plans. The drainage plans, as proposed
by Halff, may need to be modified prior to final construction.
It is our intention to place all storm drainage in a closed
conduit system with no open ditches. This may present some
problems with the drainage plan prepared by Halff. We understand
they based their plans on assumed grades for Belt Line Road.
As soon as we complete the preliminary drainage plans for Belt
Line Road, we would like to set up a meeting between all parties
concerned to discuss the situation. '-
Should you have any questions or comments in the meantime, please
do not hesitate to contact us.
Sincerely,
Gabe Favre
GF/dsp
cc:
Pat Donovan, Dunning Development w/enclosure
Alan D. Ratliff, City of Coppell, City Manager
Russell Doyle, P.E., City of Coppell,
H. Wayne Ginn, P.E.
John Karlsruher, P.E.
File 375
enclosure
City Engineer
FO WA qI)ED TO
MAYOR A. ArD C/OUNCIL
DATE: .
17103 Prcston Road · Suitc 100 · I,B 118 · Dallas, Tcxas 75248 ·Phonc 214/248-4900