Loading...
Valley R Center-CS 890822 ARCHITECTU 7.01 ~.eeting at City Offyes 8-22-89 T~k~ e nt ~ Distributio~: Larry Davis - Coppell Howard Pafford - Coppell Shohre Daneshmand - Coppell Gabe Favor - Greg Kuhn - A. Halff Steve Lemke Dunaway Scott Morway - Dunning Brent Littlefield - Western Builders John Hefner - A. Halff Don Calahan - Hydro Utility Rick Walker - Urban ~arry Davis John Hefner Steve Lemke Scott Morway Peter Canny Louis Taylor Mike Robertson File #84437.04 Agenda: Sanitary Sewer Problems Discussion of Alternatives a. Lay line up to box culvert and plug. b. Punch line through culvert. c. Flatten out grade of line. d. Slope lines on each side of box culvert away from the culvert - this is planned at a point 500' + to the east of the box culvert already. e. Extend line across Beltline. Discussion on Alternate d a. J. Hefner indicated the problem would be the expectation of the present landholder to sell the 500' of property which he had assumed would have sewer service without crossing Beltline. Capitol expenditure would be much higher now to provide sewer service. 3 o Install new manhole adjacent to existing manhole east of manhole. Steve Lemke to coordinate with TRA and Bud Beene. Could run into same problems encountered by Mobil with tying into TRA manhole. High flow could create need for temporary bypass. Because of problem with TRA tie-in, install two new manholes and TRA would not need to be involved. One manhole would need to be deeper and will be located over City of Coppell main. Care should be taken during excavation to protect water line extension. Valley Ranch Centre August 22, 1989 Page 2 5o Timing: Steve Lemke to submit preliminary scheme as soon as possible. City will review preliminary information while Dunaway prepares final drawings. Sidewalk: Verify sidewalk location with Dale Jackson. END OF MEETING