Valley R Center-CS 890822 ARCHITECTU
7.01
~.eeting at City Offyes 8-22-89
T~k~ e nt ~ Distributio~:
Larry Davis - Coppell
Howard Pafford - Coppell
Shohre Daneshmand - Coppell
Gabe Favor -
Greg Kuhn - A. Halff
Steve Lemke Dunaway
Scott Morway - Dunning
Brent Littlefield - Western
Builders
John Hefner - A. Halff
Don Calahan - Hydro Utility
Rick Walker - Urban
~arry Davis
John Hefner
Steve Lemke
Scott Morway
Peter Canny
Louis Taylor
Mike Robertson
File #84437.04
Agenda: Sanitary Sewer Problems
Discussion of Alternatives
a. Lay line up to box culvert and plug.
b. Punch line through culvert.
c. Flatten out grade of line.
d. Slope lines on each side of box culvert away from
the culvert - this is planned at a point 500' + to
the east of the box culvert already.
e. Extend line across Beltline.
Discussion on Alternate d
a. J. Hefner indicated the problem would be the
expectation of the present landholder to sell the
500' of property which he had assumed would have
sewer service without crossing Beltline. Capitol
expenditure would be much higher now to provide
sewer service.
3 o
Install new manhole adjacent to existing manhole east
of manhole. Steve Lemke to coordinate with TRA and Bud
Beene. Could run into same problems encountered by
Mobil with tying into TRA manhole. High flow could
create need for temporary bypass. Because of problem
with TRA tie-in, install two new manholes and TRA would
not need to be involved. One manhole would need to be
deeper and will be located over City of Coppell main.
Care should be taken during excavation to protect water
line extension.
Valley Ranch Centre
August 22, 1989
Page 2
5o
Timing: Steve Lemke to submit preliminary scheme as
soon as possible. City will review preliminary
information while Dunaway prepares final drawings.
Sidewalk: Verify sidewalk location with Dale Jackson.
END OF MEETING