Loading...
Mobil Sta MacA-CS 880516/' ~-i?/ //::-~ ~ The City With A Beautiful Future ,I L May 16, 1988 P,O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 E. F. McKinney Uami]l & McKinney Arch. & Eng. Regent ~lace 1304 Walnut Hill Ln. #222 Irving, Texas 75038 RE: Construction Plan Review for Exxon at Beltline & MacArthur Dear Mr. McKinney: These items will need to be corrected before your plans will be approved for construction: 1) 12" water line along Exxon frontage of Beltline and along MacArthur will need to be installed with this project. 2) 12" water line will need to be extended from the 24" on northeast side of Beltline to existing 12" water line on E. MacArthur and disconnection from Irving at bridge or this side will not have water. Need sidewalks along your MacArthur and along Beltline frontage. If 6" sanitary sewer along west property line is not installed prior to construction of this project, they will have to utilize the manhole on the north property line. The 12" sanitary sewer line is V.C.P.. 5) Reinforcing shall be #3 on 24" o.c.. 6) Subgrade under all paving surfaces shall be stabilized on 6" l~me @ 6%. 7) S~te plan and water/sanitary sewer plan will need to match. 8) Landscape plan will need to be sealed by a landscape architect. 9) Need minimum 2" caliper tree for every 40 feet of frontage. 10) Will need to berm areas between drive approaches. CO~V 11) Irrigation plan will need to be sealed by a licensed irrigator. 12) Irrigation plan shows inadequate sprinkler coverage, wi~! need to revise irrigation plan. If you have any questions, please feel free to call m~ ~1 462-8495. Thank you, Steven M. Morton Chief Developmental Inspector SMM/bb cc: Steve Goram Richard Diano Per Birdsall Howard Pafford Kevin Peiffer Taryon Bowman