Valley R Plaza 1P-CS 961203The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
John Evans
Beltline / MacArthur Joint Venture
5950 Brookshire Ln., Suite 410
Dallas, TX 75225
December 3, 1996
3rd Replat of Valley Ranch Plaza, Pads B thru F (Valley Ranch Plaza)
Development Fee Assessment
Dear Mr Evans:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $17,485.63 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, . ~),
Director otql~blic Works/City
Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: 3rd Replat of Valley Ranch Plaza, Pads B thru F (Valley Ranch Plaza)
Date: 12/3/96
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COIYNCIL
APPROVAL
Water Impact Fee $7,200.00 $7,200.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $195.98
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $195.98
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $35.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $3,600.00 $3,600.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $6,685.63 $6,685.63
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
I~OTAL $18,142.59
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $17,485.63
DEVELOPMENT FEE WORKSHEET
PROJECT: 3rd Replat of Valley Ranch Plaza, Pads B thru F (VaEey Ranch Plaza)
DATE: 12/3/96
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
I - 2 inch = 8
I - 2 inch
0 - N/A
= 8
ESU's
ESU's
ESU's
ESU's
Total #: 16 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s) @ $195.98
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: ' 0 Fireline Meter(s) ~
(100% due prior to issuance of water meters)
$195.98
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
[rrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $35.00 es.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
8
@$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 es.
(100% due prior to issuance of building permit)
$7,200.00
$100.00
$195.98
$195.98
$0.00
$0.00
$30.00
$35.00
$3,600.00
$50.00
$50.00
Page I
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$6,685.63
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available ar this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submiUal of
development contracts
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
3rd Replat of Valley Ranch Plaza, Pads B thru F (Valley Ranch Plaza)
12/3/96
ROADWAY IMPACT FEE:
Service Area * 8
Cormnercial
Cate~or~ **
Land Use **
Buildin[ Size (ScI. Ft.)
Development Units ** 19.2
Vehicle Miles per Developmem Unit ** 4.77
Fee per Vehicle Mile *** $73
Shoppin~ Center
19,200
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee Per Vehicle Mile) =
$6,685.63
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)