Loading...
Valley R Plaza 1P-CS 961203The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 John Evans Beltline / MacArthur Joint Venture 5950 Brookshire Ln., Suite 410 Dallas, TX 75225 December 3, 1996 3rd Replat of Valley Ranch Plaza, Pads B thru F (Valley Ranch Plaza) Development Fee Assessment Dear Mr Evans: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $17,485.63 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, . ~), Director otql~blic Works/City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: 3rd Replat of Valley Ranch Plaza, Pads B thru F (Valley Ranch Plaza) Date: 12/3/96 TOTAL AMOUNT DUE FEES DUE PRIOR TO COIYNCIL APPROVAL Water Impact Fee $7,200.00 $7,200.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $195.98 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $195.98 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $6,685.63 $6,685.63 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts I~OTAL $18,142.59 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $17,485.63 DEVELOPMENT FEE WORKSHEET PROJECT: 3rd Replat of Valley Ranch Plaza, Pads B thru F (VaEey Ranch Plaza) DATE: 12/3/96 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): I - 2 inch = 8 I - 2 inch 0 - N/A = 8 ESU's ESU's ESU's ESU's Total #: 16 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: ' 0 Fireline Meter(s) ~ (100% due prior to issuance of water meters) $195.98 Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) [rrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 es. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 8 @$450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 es. (100% due prior to issuance of building permit) $7,200.00 $100.00 $195.98 $195.98 $0.00 $0.00 $30.00 $35.00 $3,600.00 $50.00 $50.00 Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $6,685.63 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available ar this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submiUal of development contracts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: 3rd Replat of Valley Ranch Plaza, Pads B thru F (Valley Ranch Plaza) 12/3/96 ROADWAY IMPACT FEE: Service Area * 8 Cormnercial Cate~or~ ** Land Use ** Buildin[ Size (ScI. Ft.) Development Units ** 19.2 Vehicle Miles per Developmem Unit ** 4.77 Fee per Vehicle Mile *** $73 Shoppin~ Center 19,200 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee Per Vehicle Mile) = $6,685.63 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)