Loading...
Valley R Baptist 2-CS020703COPPELL July 3, 2002 Mr. Jim Riley, P.E. Brockette/Davis/Drake Inc. 4144 North Central Expressway, Suite 1100 Dallas, TX 75204 RE: Valley Ranch Baptist Church Lot 1 Block A Fee Assessment Letler Dear Mr. Riley, Enclosed is a copy of the City of Coppell Development Fee Assessment Table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount ofl;1,632.28 and forward the check to the Engineering Department along with a copy of the Fee Assessment Table. This amount is the portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance cfa Building Permit. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 732 Deforest Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works CC; Jennifer Armstrong, Finance Director Mary Beth Spletzer, Admin. Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEES IoPROJECT NAME: ENGINEER: RIGINATION DATE: Valley Ranch Baptist Church, Phase 2 Brockette/Davis/Drake 7/3/02 SENT ASSESSMENT Park Fee ASSESSED FEE AMOUNT PAID DATE 7/3/02 Water Impact Fee $7,420,00 7/3/02 Wastewater Impact Fee $4,480,00 Street Sign Street Light 7/23/02 7/3/02 Construction Inspection $8,022.90 Roadway Impact-Zone $1,632.28 Early Grading $872.10 Overtime Inspection $8,022,90 rb 7/23/02 $1,632.28 rb 7/9/02 $872,10 rb 7/9/02 7/3/02 7/3/02 7/3/02 7/3/02 7/3/02 7/3/02 7/3/02 Water Tap Inspection $200,00 Wastewater Tap Inspectio $100,00 Water Meter (Domestic) $410.56 Water Meter (Fire/Irrig) $2,297,72 Meter Deposit (Domestic) $60,00 Meter Deposit (Fire/Irrig) $60,00 Utility Final Inspection $100.00 ~Subtotalto En~, $10,527,28 $200,00 8/9/02 $100.00 8/9/02 $410.56 8/9/02 $2,297,72 8/9/02 $60.00 8/9/02 $60.00 8/9/02 $100,00 8/9/02 $10,527.28 $0.00 TotaIFees TOTALS $2&655,56 NOTES Prior To Construction Date Received Erosion Control Approved E,P.A,-N,O.I. Recd, Const. Plan Approved Fees Paid Amount Owed $13,755.56 $11,900,00 I Prior To Final Acceptance As Built Plan Recd, Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. DEVELOPMENT FEE WORKSHEET PROJECT: Valley Ranch Baptist Church Lot 1 Block A DATE: 7/3/2002 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 2 - 2 inch = 16 ESU's 1 - 2 inch = ' 8 ESU's 0 = 0 ESU's 1 - 8 inch = 2.5 ESU's Total#: 26.5 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. '~Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 2 Domestic Meter(s) @ $205.28 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $205.28 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 1 Fireline Meter(s) @ $2,092.44 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 16 @ $280.00 ea. (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 2 Lots @ $50.00 ea. (100% due pdor to issuance of building permit) $7,420.00 $200.00 $410.56 $205.28 $0.00 $2,092.44 $60.00 $60.00 $4,480.00 $100.00 $100.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Prelim/nary plat approved: 0 Single-family @ $0.00 per lot 0 Multi-family @ $0.00 per unit (50% paid pdor to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electdc submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) $0.00 $0.00 $1,632.28 Information not Available Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvemen~ that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 DEVELOPMENT FEE TABLE Project: Valley Ranch Baptist Church Lot I Block A Date: 7/3/2002 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $7,420.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $410.56 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,297.72 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $60.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $4,480.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $ ! 00.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $1,632.28 $1,632.28 '(100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) I[ tOTAL $16,760.56 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $1,632.28 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Valley Ranch Baptist Church Lot 1 Block A 7/3/2002 ROADWAY IMPACT FEE: Service Area * 8 Catel~ory * * Institutional Land Use ** ChurctgSyna~o~ue Buildinl~ Area (sf) 43,000 Development Units ** 43.00 Vehicle Miles per Development Unit ** 0.52 Fee per Vehicle Mile *** $73 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $1,632.28 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) ] AMOUNTDUE: $1,632.28 I