Loading...
Villages C P3&4-CS 9310256330 Belt Line Road, Suite C Garland, Texas 75043 P.O. Box 478 Coppell, Texas 75019 214-462-OO22 Re: Bond Walk Through - Villages of Coppell III and IV-B Dear Mr. Porter: A recent follow up bond walk through of the above referenced projects was performed on October 13, 1993. The following paving related items were found to be deficient. Villaaes of CooDell IIIB: 1. South end of Parker construction joint has chips, broken curb patch, and seal. 2. Longitudinal random crack @ 909 - 905 Brentwood. 3. Transverse random crack @ Brentwood and Nottingham. 4. Random crack in the approach on the west side of Nottingham and Brentwood. 5. Construction joint Beau and Parker has large chip @ center line. 6. Random crack in alley approach across form 693 Nottingham. 7. Random crack in alley behind 905 and 913 Brentwood. Villaqes of Coppell IV-B: 1. Random crack @ approach of Cheshire and Lakeview. 2. Random crack @ curb inlet throats on Cheshire. The bonding period for the paving portion of these be over on November 4, 1993. I am forwarding this to schedule the needed repairs. two projects will information for you Please contact my office and provide the anticipated schedule by October 29, 1993. /SWeet Superintendent cc~~G~Goram,.~Director~of.~Publlc~orks· Larry Davis, Construction Inspection Site Concrete, Inc., P.O. Box 140096, Irving, Tx. 75014-0096