Loading...
Villages CC 1-3-CS 920528COPPELL PUBLIC ~40RANDUW DATE: TOt FROM: RE: May 28, 1992 ~ Ken Griffin, City.En.g~neer' . ,1Y~/ Howard Pafford, Utilities Superintendent ~ Development Fees for Villages at Cottonwood Creek Section IV The following fees should be assessed on the above referenced project. Water Impact Fee: 152 - 5/8" x 3/4" (Does not include Irrigation) Domestic Meter/s = Irrigation Meter/s = Fireline Meter/s = 152 ESU's ESU's ESU's Total 152 ESU's ~ $650.00 eam 598.800.00 100% due prior to Council approval of final plat. * There will be water impact fees on the irrigation meters. Wastewater Impact Fee: (HUD) 152-5/8" x 3/4" Domestic Meter/s = 152 ESU's ~ $225.00 = $34,200,00 100% due prior to Council approval of final plat. Water Tap Inspection Fee 152 Connections @ $100.00 each = $15.200,00 100% due prior to issuance of building permit. Sewer Tap Inspection Fee 152 Connections ~ $I00.00 each = $15.200.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lightingPlan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 152 Residential Lots at $150.00 each = $22,800.00 Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/mp cc: Steven G. Goram, Director of Public Works DEVELFE4.HLP for STREET SIGN ASSESSMENT Villaqes at Cottonwood Creek Section IV The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $ 53.10 Speed Limit $ 63.54 31 $1,969.74 Yield $ 58.56 Stop $ 65.12 Street Name $ 11.60 1 11.60 Stop & Street Combo $ 96.85 11 1,065.35 OTHER No Outlet $ 11.60 6 $ 69.60 TOTAL $3,116.29 * Cost breakdowns may be obtained from Public Works by written request. Revised 5/28/92