Loading...
Villages CC 1-3-PT 930702Bore/Excavation in Public Right-Of-Way Permit City of Coppell - Public Works Department Project Name: Address: ,_-7/0 /~/- /~o 6-~-,~ -C Phone: Emergency Phone: / Representing: ~&f ? Inspector: ,~o~ /--/~Y~'~_~ T'ype of Work/General Description: Location of Work: I[ave A~i City and/or Franchise Utilities Been Contac=ed and Existinq Utilities Located: ~,= ~-G-9~ YES NO Will It Be Necessary to Excavate Street, Alley or Sidewalk Pavement? ~/o YES (attach permit) NO Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. A.rea(s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street or alley must be repor=ed to the Police, Fire, and Public Works DepaxT. men~e prior to closing (462-1144, 462-1133 and 462-8495). AUtach Work Order (Franchise 0nly) PAGE 2 PERMIT Attach Barricading/Detour Plan if a lane or street closure is applicable. j,?//I : . Franchise/Contractor Representative Date Franchise Inspector/or City Inspector A~ p~~~ ~ d~e:~ss enta ~ive Date Applicant shall indemnify and forever hold harmless against each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blockinq, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. PERMIT. PHB All contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. ? [] Outside C/L LOCATION ~ p/34 TOWN PLANT SCHOOL DIST, LONE STAR GAS COMPANY P~posed },Project Sketch of { Completed MAP SHEET NO.(s)_ /~ (~ 73 ABANDONED PIPELINI~ CHAP OISTI~IJ~UTION PLANTS RETURNED TO WAREHOUSE EW INSTALLATION OHginal ER No. or Date of Install~}i~ri t~tXreplacemant a;ld retirement projects Only: [] Outside C/L LOCATION ~'~- <~.~PE/] TOWN PLANT SCHOOL DIST, LONE STAR GAS COMPANY ~ Proposed } Project Sketch of ! Completed Co. No.: MAP SHEET NO.(s),./-,~' Region:~ SUMMARY OF PIPELINE CHANGES IN ABANDONED DISTRIBUTION PLANTS RETURNED~O WAREHOUSE NEW INSTALLATION Origina[ ER No, or Date of Installation for replacement and retirement projects only: Date of this report